My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150278 Letter of Substaintial Completion
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150278 Letter of Substaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:15:01 AM
Creation date
8/5/2009 10:57:47 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150278
Contractor Name
Weldon Valley Ditch Company
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COL~RADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866~474 <br />www.cwcb.state.co.us <br />July 20, 2009 <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br />Mr. Eric Christensen, Secretary <br />Weldon Valley Ditch Company <br />P.O. Box 626 <br />Weldona, CO 80653 <br />Re: Contract Number C 150278 - Cottonwood Flume Replacement <br />Dear Mr. Christensen: <br />Bill Ritter Jr. <br />Governor <br />Harris D. Sherman <br />DNR Executive <br />Director <br />Jennifer L. Gimbell <br />CWCB D'uector <br />Dan McAuliffe <br />CWCB Deputy <br />Director <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />July 1, 2009. <br />In accordance with the Contract, the Weldon Valley Ditch Company owes $82734 for interest during construction, as <br />calculated on the attached spreadsheet, due by August 14, 2009. Please make your check far interest during construction payable <br />to the Colorado Water Conservation Board and include the Contract Number on the check. <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your fust loan payment in the amount of $6,601.65 is <br />due on July 1, 2010. A 1% loan service fee of $1,282.54 was added to your principal balance of $128,254.06, for a fimal loan <br />balance of $129,536.60. An adjustment of $6,813.40 has been subtracted from your approved loan balance of $136,350.00, to <br />adjust for your final principal balance of $129,536.60. In order to eliminate the need to amend the contract, the annual loan <br />payment is based on the Company's approved contract amount of $136,350.00, resulting in a term reducrion, as illustrated on the <br />attached Loan Repayment Schedule. Addirionally, attached is a copy of the Promissory Note. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Boazd to work with the Weldon Valley Ditch Company on <br />the successful complerion of this project. Plaase call if you have any quesrions regarding this matter or if we can be of service to <br />you in the future. <br />Sincerely, <br />Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Secrion <br />cc. Eric Wilkinson, CWCB Board Member <br />Water Supply Planning and Finance Secrion Contract Amount <br />Project file Expended Amount <br />Contract file <br />_ $136,350.00 <br />= $129,536.60 <br />Flood Protection . Water Supply Planning and Finance • Stream and Lake Protection <br />Water Supply Protecrion • ConservaLion and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.