My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02522
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:51:17 AM
Creation date
8/5/2009 10:56:28 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150130
Contractor Name
South Side Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />rt <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br />Bill Ritter Jr. <br />July 20, 2009 Govemor <br />Harris D. Sherman <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPA1'MENT DNR Executive <br />Director <br />Jennifer L. Gimbel <br />Mr. Stephen McMillan, President CWCB Director <br />South Side Reservoir Company <br />1574 W. County Road 16 Dan McAuliffe <br />Loveland, CO 80537 CwCS Deputy <br />Director <br />Re: Contract Number C 150130 - South Side Reservoir Rehabilitation <br />Dear Mr. McMillan: <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />July 1, 2009. <br />In accordance with the Contract, the South Side Reservoir Company owes $6,956.17 for interest during construction, as <br />calculated on the attached spreadsheet, due by August 14, 2009. Make your check payable to the Colorado Water Conservation <br />Board and include the loan contract number on the check. <br />Your first loan payment in the amount of $8,331.85 is due on July 1, 2010, and was calculated based on a$161,217.05 <br />final loan balance at 3.1% for 30-years, which includes a 1% loan service fee of $1,596.20. Vaughn McWilliams, our Contract <br />Administrator, will be amending the Promissory Note, contained as Appendix 2 of the contract to reflect the final loan contract <br />amount. <br />~ In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Board to work with the South Side Reservoir Company on <br />the successful completion of this project. Please call if you have any quesrions regarding this matter or if we can be of service to <br />you in the future. <br />Sincerely, <br />~ Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Section <br />Copy: Eric Wilkinson, CWCB Board Member <br />Water Supply Planning and Finance Secrion <br />Project file <br />Contract file <br />Contract Amount = $363,300.00 <br />Expended Amount = $161,217.05 <br />Flood Protection • Water Supply Planning and Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Plaruung <br />
The URL can be used to link to this page
Your browser does not support the video tag.