My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado's Obligation During First Increment PRRIP
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
Colorado's Obligation During First Increment PRRIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:50 PM
Creation date
6/19/2009 2:42:32 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.350
Description
Legislation
State
CO
Basin
South Platte
Water Division
1
Date
1/1/3000
Author
Unknown
Title
Colorado's Obligation During First Increment PRRIP
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Colorado's Obligations During First Increment of the Platte River Program <br />Document Reference Obligation Timing p <br />Milestones Document (12/7/05)/ Complete construction of Tamarack 1: Consultation with the FW; <br />Program Water Plan Colorado's Tamarack I is found in the Program By the end of Year 4: maximize the benefit of it: <br />(Attachment 5, Section 3) Water Plan (Attachment 5, Section 3) Commence full operations of Tamarack I purposes <br /> Prior to the end of Year 2: <br /> Colorado will secure any necessary Colorado or federal <br /> authorizations and appropriate <br /> compliance under NEPA <br /> By the end of Year 2: <br /> Begin operation of 50% of the Tamarack I <br /> No Date Requirement: <br /> Account for Tamarack I water passing to the Colorado- <br /> Nebraska Stateline <br /> No Date Requirement: <br /> Develop an annual operations plan and coordinate that <br /> plan with the FWS's EA Mgr <br /> Is not dependent on annu <br /> decisions made by the EE <br /> hydrologic conditions duri <br /> (At least) By the end of the First Increment <br /> Reconnaissance-Level Water Action Plan: As appropriate, the GC w <br />Program Water Plan capable of providing at least an average of determine what quantities <br />(Attachment 5, Section 6) 50,000 acre-feet per year (Co/orado's portion) the individual projects <br /> By the end of Year 3 of the First Increment: <br /> The Governance Committee will complete feasibility <br /> studies on proposed projects and develop a Water Action <br /> Plan, if necessary <br /> By the end o Year 8 o the First Increment: <br /> Capable of providing at least an average of 25,000 acre- <br /> feet per year of shortage reduction to target flows <br /> By no later than the end of the First Increment: <br />Program Land Plan The Land Plan: Protect and, where appropriate, restore 10,000 acres of The Program and this Mil <br />(Attachment 4) (Co/orado participation is limited) habitat 2,650 acres for the NPPC <br /> Within one year of land acquisition: <br /> A management and restoration plan specific to each <br /> parcel of land protected will be prepared <br /> By the end o Year 9 o the First ncrement: <br /> The GC will use its best efforts to protect 10,000 acres of A First Increment land bu <br /> habitat, including the 2,650 acres of habitat with the NPPD including cash equivalent <br /> Cottonwood Ranch Property forth in the Program budc
The URL can be used to link to this page
Your browser does not support the video tag.