Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br />Bill Ritter Jr. <br />June 30, 2008 Governor <br />Harris D. Sherman <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT DNR Executive <br />Director <br />Jennifer L. Gimbel <br />Mrs. Debbie Chumley, Town Clerk CWCB Director <br />Town of Keenesburg <br />P.O. Box 312 Dan McAuliffe <br />Keenesburg, CO 80643-0312 CWCB Deputy <br />Duector <br />Re: Contract Number C150223 -Well Purchase and Pipeline Construction <br />Dear Mrs. Chumley: <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />July 1, 2008. <br />In accordance with the Contract, the Town of Keenseburg owes $81,120.99 for interest during construction, as calculated <br />on the attached spreadsheet, due by July 20, 2008. Make your check payable to the Colorado Water Conservation Board and <br />include the loan contract number on the check. <br />Your first loan payment in the amount of $63,265.05 is due on July 1, 2009. The $63,265.05 annual loan payment was <br />calculated based on a $1,127,968.00 final loan balance at 3.75% for 30-years, which includes a 1 % loan service fee of $11,168.00. <br />Vaughn McWilliams, our Contract Admuustrator, will be amending the Promissory Note, contained as Appendix 2 of the contract <br />to reflect the final loan contract amount. <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Town of Keenesburg on the <br />successful completion of this project. Please call if you have any questions regarding this matter or if we can be of service to you <br />in the future. <br />Sincerely, ~, <br />~ ' <br />`" ~ ~~' <br />Mike Serlet, P.E. <br />Chief, Water Supply Planning and Finance Section <br />cc. Eric Wilkinson, CWCB Board Member <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br />Contract Amount = $1,523,080.00 <br />Expended Amount = $1,127,968.00 <br />Flood Protection • Water Supply Planning and Finance • Stream and Lake Protection <br />Water Supply Protection • Conservation and Drought Planning <br />