My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23c
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
23c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:31 PM
Creation date
10/2/2008 1:36:09 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/17/2008
Description
CF Section - New Project Loans - WRCC, Inc. - Windsor Dam and Spillway Maintenance Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax: (303) 866-4474 <br />www.cwcb.state.co.us <br />Bill Ritter, Jr. <br />Governor <br />TO: Colorado Water Conservation Board Members <br />Harris D. Sherman <br />DNR Executive Director <br />FROM: Anna Mauss, PE <br />Jennifer L. Gimbel <br /> Mike Serlet, PE, Chief <br />CWCB Director <br /> Water Supply Planning & Finance Section <br />Dan McAuliffe <br />CWCB Deputy Director <br />DATE: September 9, 2008 <br />Agenda Item 23c, September 16-17, 2008 Board Meeting <br />SUBJECT: <br /> Water Supply Planning and Finance Section – New Project Loans <br /> WRCC, Inc. – Windsor Dam and Spillway Maintenance Project <br />Introduction <br />WRCC, Inc. (Company) has reques ted a loan for 90% of the cost of its Big Windsor Dam and <br />Spillway Maintenance Project (Project). The Project involves da m crest maintenance, elimination of <br />an abandoned spillway, and spillway extension construction at Big Wind sor Reservoir with an <br />estimated cost of $1,413 ,000. See attached Project Data Sh eet for a location map and a project <br />summary. <br />Staff Recommendation <br />Staff recommends the Board approve a loan not to exceed $1,285,730 ($1,273,000 for project costs <br />and $12,730 for the 1% Loan Service Fee) to WRCC, Inc. for the Windsor Dam and Spillway <br />Maintenance Project from the Severance Tax Trus t Fund Perpetual Base Account. The terms of the <br />loan shall be a 30-year loan at a blended rate of 2.55% per annum. Security for the loan shall be in <br />compliance with CWCB Financial Policy #5. <br />Staff further recommends an additional contract condition requiring full payment of the Farmers <br />Bank bridge loan with proceeds from the CWCB funds. <br />Water Supply Protection • Watershed Protection & Flood Mitigatio n • Stream & Lake Protection • Water Supply Planning & Finance <br />Water Conservation & Drought Planning • In trastate Water Management & Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.