My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150268 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150268 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:15:09 PM
Creation date
8/11/2008 11:55:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150268
Contractor Name
Louden Irrigating Canal and Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />July 28, 2008 <br /> <br />Bill Ritter, Jr. <br />Governor <br /> <br />Harris D. Sherman <br />DNR Executive Director <br /> <br />Mr. Dale Leach, President <br />Louden Irrigating Canal and Reservoir Company, rnc <br />4009 E. County Road 30 <br />Ft Collins, Colorado 80528 <br /> <br />Jennifer 1. Gimbel <br />CWCB Director <br /> <br />Dan McAuliffe <br />CWCB Deputy Director <br /> <br />RE: Rist Benson Reservoir Dam Repair Project <br />Contract Number C150268 <br /> <br />Dear Mr. Leach: <br /> <br />r am pleased to inform you that on July 23,2008 the Colorado Water Conservation Board (CWCB) <br />approved your loan request for the Rist Benson Reservoir Dam Repair Project as described in the <br />application and approved Loan Feasibility Study titled "Feasibility Study for Rist-Benson Reservoir <br />Dam Repair, May, 2008". The Board approved a loan not to exceed $263,610 ($261,000 for project <br />costs and $2,610 for the 1 % Loan Service Fee) with loan terms of3.5% per annum for 30 years. I have <br />attached a copy of the updated Board memo dated July 28,2008, that includes the Board's approval. <br /> <br />After the Board approves a loan there are a few steps that remain in the loan process including: <br /> <br />A) Contracting: An approved contract must be in place before funds can be disbursed. Vaughn <br />McWilliams will initiate the loan contracting process for this project. When all of the contract <br />conditions are met and the contract is executed the Company may request loan funds to cover <br />eligible project expenses. You can contact Vaughn at (303) 866.3462 regarding the <br />requirements. <br /> <br />B) Design/Construction: You must adhere to the CWCB Design and Construction Administration <br />Procedures. Tim Feehan will contact you regarding this phase of the process. Tim will make <br />construction site visits, which will be the basis of pay estimates for disbursement of your loan <br />funds. You can contact Tim at his desk at (303) 866.3480 or cell phone (303) 618.5010. <br /> <br />Water Supply Protection. Watershed Protection & Flood Mitigation. Stream & Lake Protection. Water Supply Planning & Finance <br />Water Conservation & Drought Planning. Intrastate Water Management & Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.