Laserfiche WebLink
SPDSS Memorandum <br />Final <br />To: Ray Alvarado and Ray Bennett <br />From: LRE -Rick Parsons, and Erin Wilson <br />Subject: Task 5 -Key Municipal User, Denver Water Board <br />Date: February 19, 2007 <br />INTRODUCTION <br />One of the Task 5 objectives is to: <br />Develop and document an understanding of the operations of key water use facilities in <br />the basin in order to facilitate consumptive use modeling and to support selected data <br />needs for modeling being done by other contractors. This understanding will be <br />developed through interviews with DWR personnel, operators of large canal and <br />reservoir systems, and representatives of federal facilities. <br />Types of key water use facilities include diversion structures, transmountain diversions, <br />reservoirs, and reservoir systems. <br />• Key diversion structures, identified as part of Task 3, include structures representing 85 <br />percent of net decreed rights, structures diverting greater than 1,000 acre-feet per year (ac- <br />ft/yr), and structures of administrative importance. <br />• Key transmountain diversions, identified as part of Task 4, include those structures that <br />transport non-native water from another basin into the South Platte River basin. <br />• Key reservoirs, identified as part of Task 5, include reservoirs or reservoir systems with <br />greater than 10,000 acre-feet (ac-ft) capacity and/or reservoirs that should be included in <br />potential future modeling efforts due to their impact on basin operations. Reservoir systems <br />are defined as a group of reservoirs on the same tributary or filled by the same diversion <br />structure that satisfy a common demand or are operated in a similar fashion. <br />A number of components in the Denver Water Board System (Denver Water) have been <br />identified as key structures for the South Platte Decision Support System (SPDSS) consumptive <br />use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document <br />physical, legal, and operational aspects of those key structures. <br />The information provided in this memorandum was developed <br />from publicly accessible sources and information provided by <br />Denver Water and its website, and discussions with <br />representatives of Denver Water. Information in this <br />memorandum is believed to be accurate. However, this <br />information should not be relied upon in any legal proceeding. <br />Table of Contents Page <br />Introduction 1 <br />System Overview 2 <br />Physical Information 5 <br />Water Rights 29 <br />Operational Information 33 <br />References 40 <br />