Laserfiche WebLink
CRDSS <br />TASK MEMORANDUM 1.07-3 <br />Physical Characteristics Database <br />Physical Characteristics Database Year 1 Summary <br />1.0 ISSUE <br />This task memorandum summarizes the progress made on the physical characteristics database in Year 1. <br />2.0 DISCUSSION/ANALYSIS <br />Phase I (January-April 1994) <br />Subtask 1: Review Spatial Data Requirements, Complete Inventory of Sources, and Create a <br />Population Schedule for Phase IIa <br />A physical characteristics database requirements document was prepared (Task Memorandum <br />? <br />1.07-1) identifying possible sources and planning strategy for design and implementation. <br />Subtask 2: Revise and Develop a Work Plan for Phase I and IIa <br />A time-line was created along with a detailed work plan for Phase I. These documents identify <br />? <br />subtasks that support the goals outlined in the Year 1 scope of work. <br /> <br />Dates and responsibilities were identified in the work plan for when software and hardware <br />? <br />should be in place to coordinate with other activities. <br />Phase IIa (May-December 1994) <br />Subtask 1: Finalize Data Requirements <br />The physical characteristics data were identified for the cumulative use (CU) model and the <br />? <br />water rights planning model. Task Memorandum 1.07-1 was revised accordingly. <br />Subtask 2: Review Database Design <br />Storage and retrieval capabilities of information from the database were tested. <br />? <br /> <br />Database entities were designed for the efficient storage and retrieval of data for the modeling <br />? <br />tasks. <br />Subtask 3: Populate Database <br />The State DAMS database was inventoried. The following data fields were identified to be <br />? <br />populated from this source: <br />1 <br />A 275 01.09.95 1.07-3 Lange <br />