My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRDSS_Task1_07-3_PhysicalCharacteristicsDatabaseYear1Summary
CWCB
>
Decision Support Systems
>
DayForward
>
CRDSS_Task1_07-3_PhysicalCharacteristicsDatabaseYear1Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2011 10:18:51 AM
Creation date
6/2/2008 9:01:36 AM
Metadata
Fields
Template:
Decision Support Systems
Title
CRDSS Task 1.07-3 - Physical Characteristics Database - Physical Characteristics Database Year 1 Summary
Description
This task memorandum summarizes the progress made on the physical characteristics database in Year 1.
Decision Support - Doc Type
Task Memorandum
Date
1/9/1995
DSS Category
HydroBase
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C153658, C153727, C153752
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CRDSS <br />TASK MEMORANDUM 1.07-3 <br />Physical Characteristics Database <br />Physical Characteristics Database Year 1 Summary <br />1.0 ISSUE <br />This task memorandum summarizes the progress made on the physical characteristics database in Year 1. <br />2.0 DISCUSSION/ANALYSIS <br />Phase I (January-April 1994) <br />Subtask 1: Review Spatial Data Requirements, Complete Inventory of Sources, and Create a <br />Population Schedule for Phase IIa <br />A physical characteristics database requirements document was prepared (Task Memorandum <br />? <br />1.07-1) identifying possible sources and planning strategy for design and implementation. <br />Subtask 2: Revise and Develop a Work Plan for Phase I and IIa <br />A time-line was created along with a detailed work plan for Phase I. These documents identify <br />? <br />subtasks that support the goals outlined in the Year 1 scope of work. <br /> <br />Dates and responsibilities were identified in the work plan for when software and hardware <br />? <br />should be in place to coordinate with other activities. <br />Phase IIa (May-December 1994) <br />Subtask 1: Finalize Data Requirements <br />The physical characteristics data were identified for the cumulative use (CU) model and the <br />? <br />water rights planning model. Task Memorandum 1.07-1 was revised accordingly. <br />Subtask 2: Review Database Design <br />Storage and retrieval capabilities of information from the database were tested. <br />? <br /> <br />Database entities were designed for the efficient storage and retrieval of data for the modeling <br />? <br />tasks. <br />Subtask 3: Populate Database <br />The State DAMS database was inventoried. The following data fields were identified to be <br />? <br />populated from this source: <br />1 <br />A 275 01.09.95 1.07-3 Lange <br />
The URL can be used to link to this page
Your browser does not support the video tag.