My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRDSS_Task1_05-32_DesignAndImplementationYear1Summary
CWCB
>
Decision Support Systems
>
DayForward
>
CRDSS_Task1_05-32_DesignAndImplementationYear1Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2011 10:18:52 AM
Creation date
5/30/2008 3:48:34 PM
Metadata
Fields
Template:
Decision Support Systems
Title
CRDSS Task 1.05-32 - Study of System Integration Issues Design and Implementation Coordination Year 1 Summary
Description
The following issues are addressed in this memorandum: 1)Have the work products defined in the scope of work been completed? 2)What decisions were made in coordinating system development and system integration? 3) Do any concerns about system integration exist for Year 2 of the project?
Decision Support - Doc Type
Task Memorandum
Date
1/9/1995
DSS Category
DMI Utilities
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C153658, C153727, C153752
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CRDSS <br />TASK MEMORANDUM 1.05-32 <br />Study of System Integration Issues <br />Design and Implementation Coordination Year 1 Summary <br />1.0 ISSUE <br />Individual components of the CRDSS are to have been integrated into a system of compatible <br />components according to the specifications defined in the scope of work and the specifications developed <br />during Year 1 (see all of the task memoranda for Task 1.05). This task involved not only developing <br />specifications, but also coordinating development to ensure that the specifications were followed. The <br />following issues are addressed in this memorandum: <br />Have the work products defined in the scope of work been completed? <br />? <br />What decisions were made in coordinating system development and system integration? <br />? <br />Do any concerns about system integration exist for Year 2 of the project? <br />? <br />Note that the task number for Task 1.05 has remained so throughout Year 1 of the project; however, <br />suffixes have been dropped from work in Phase IIa to eliminate some confusion in the earlier naming <br />convention. Work described herein is referred to simply as Task 1.05 work, not 1.05(b)1 and 1.05(b)2. <br />Much of the work described in this task is commonly known as ?System Integration.? <br />2.0 DISCUSSION/ANALYSIS <br />The work products for Task 1.05 are summarized as follows: <br />Adjustment of the membership of the System Integration Team (SIT) according to the work <br />? <br />demands of the project. <br />System design documents for the database, hardware and software, communications, <br />? <br />maintenance procedures, and data recovery. <br />Development of graphical user interface (GUI) design guidelines and implementation of such <br />? <br />guidelines. <br />Development of data management interface (DMI) design guidelines and implementation such <br />? <br />guidelines. <br />Development of error-handling and debugging guidelines and implementation of such <br />? <br />guidelines. <br />Development of on-line documentation guidelines and implementation of such guidelines. <br />? <br />Development of revision control guidelines and implementation of such guidelines. <br />? <br />Development of minimum application features guidelines and implementation of such <br />? <br />guidelines. <br />1 <br />A275 .01.09.95 1.05-32. Malers <br />
The URL can be used to link to this page
Your browser does not support the video tag.