Laserfiche WebLink
<br /> <br />A,\IITY ~IUTUAL IRRIGATlO:\ CO~IPA:\Y <br />:'oif.E:\OSIIE RESf.RVOIR Rf.II,\IIIUTATIO:\ <br />-- - - - --- - <br /> <br />Project (){'S('riPtion <br /> <br />The Amity Mutual Irrigation Company ope-rates the Neenoshe Reservoir for the benefit of <br />218 shareholders by providing irrigation water storage for a 34.682-acre service area. The reservoir is <br />located about 15 miles north of Lamar and is filled by the Fort Lyon/Kicking Bird Canals. with its head <br />gate on the Arkansas River. The Class 2 dam was originally constructed in 1898. is 25-ft. high, and <br />impounds 60.618 acre-feet of water. The Slate Engineers Office restricted the reservoir in June of 1999 <br />due to the poor condition of the outlet works and seepage in the stilling basin. Project improwmcnls <br />included lining the existing outlet pipes \....ith a 27-inch steel pipe. grouted in-place. new 30-inch sluice <br />gates. new manual hoisls. and reconstruction ofthc stilling basin. <br /> <br />I>roiect Hala <br /> <br />SI)OIl..or: Amity Mutual Irrigation Co. <br /> <br />Counl)': Kiowa <br /> <br />\Valer Source: Arkansas Riwr <br /> <br />TN"IIl" of Loan: 5308.778.25 @2.75% for 30-yrs. Sub..tanlial Completion Hale: June 1.2004 <br /> <br />nl.'sil:n Enl:inl'cr: URS Corporation - Denver. Colorado <br /> <br />Con..truction Contractor: Schmeiser Genl-"fal Contmctor. Inc. - Las Animas. Colomdo <br /> <br />1)I.'..ignJCon..tructioll EIt,'mcnls: <br /> <br />80 L.F. - 27-inch Steel Pipe <br />4- 30-inch.\ 3~-inch Sluice Gales with Stcms!V,,'nt!JIloists <br />Maximum Design Release Rale = 150 cfs <br /> <br />Annual Amount of\V.tler I>elinred = flO.fll8 Acre-Feel <br />