My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
consent 3a
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
consent 3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:38:56 PM
Creation date
3/31/2008 4:14:21 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/18/2008
Description
CF Section – Changes to Existing Loans - Bijou Irrigation Company - Diversion Rehabilitation Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 8663441 <br />FAX: (303) 866-4474 <br />TO: Colorado Water Conservation Board Members <br />FROM: Tim Feehan, P.E., Project Manager <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />DATE: March 11, 2008 <br />SUBJECT: Consent Agenda, Item 3a, March 18-19, Board Meeting <br />Water Supply Planning and Finance -Changes to Existing Loans <br />Bijou L•rigation Company - Diversion Rehabilitation Project <br />Bill Ritter Jr. <br />Go~-emor <br />Harris D. Sherman <br />DNR Executiae <br />Director <br />Jeruufer L. Gimbel <br />ewes Director <br />Dan McAullife <br />CWCB Deputy <br />Director <br />Introduction <br />At the May, 2005 Board Meeting, the Board authorized staff to present revisions to existing <br />loans totaling less then 20% of the original loan as Consent Agenda Items. The Bijou Irrigation <br />Company loan increase presented below is less than 20%. <br />The Bijou Irrigation Company (Company) is requesting an increase of $45,450 to their <br />September 2007 authorization of $763,560 for the Diversion Structure Rehabilitation Project. <br />The requested loan increase is due to $45,000 in cost overruns for bladder gates, measurement <br />devices, and electrical and concrete work, as summarized on the attached letter. <br />Staff Recommendation <br />Staff recommends that the Board approve an increase of $45,450 ($45,000 for project costs and <br />$450 for the 1% Loan Service Fee) from the Severance Tax Trust Fund Perpetual Base Account. <br />The Company's amended total loan amount will be $809,010 ($801,000 for the total project <br />costs and $8,090 for the 1% loan origination fee) at the Company's current interest rate of 2.25% <br />for 30-years. Security for the loan will be a pledge of Bijou Irrigation Company's annual <br />assessment tax revenues, in compliance with CWCB Financial Policy No. 5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.