Laserfiche WebLink
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax: (303) 866-4474 <br />\\v/\v. c\vcb.state. co. us <br /> <br /> <br />TO: <br /> <br />Colorado \Vater Conservation Board Members <br /> <br />Bill Ritter, Jr. <br />GovelTIOr <br /> <br />FROM: <br /> <br />Tim Feehan, P.E., Project Manager <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br /> <br />Harris D. Sherman <br />DNR Executive Director <br /> <br />Jennifer L. Gimbel <br />CWCB Director <br /> <br />DATE: <br /> <br />January 14, 2008 <br /> <br />Dan McAuliffe <br />CWCB Deputy Director <br /> <br />SUBJECT: <br /> <br />Agenda Item 10, January 22-23, 2008 Boa.'d Meeting <br />Water Supply Planning and Finance Section - Loan Defe....al Request <br />Bill Porter Reservoir - Reservoir Construction Project <br /> <br />Introd uction <br /> <br />]\frs. Marla Porter is requesting a loan payment deferral for Loan Contract No. C150116 between <br />Bill Porter (her late husband) and CWCB, dated November 1, 2002. By letter to Steven Biondo, <br />CWCB, dated December 28, 2007 (copy attached), Dan Kerst, P. c., Personal Legal Representative <br />for the Estate of Bill Porter and for Marla Porter, has requested that the principal portion of the <br />January 2008 payment be deferred for one year and that the annual loan payment amount remain the <br />same for the remaining term of the loan. <br /> <br />Backg.'ound <br /> <br />Bill Porter was a 19% owner in the 3,600 acre Alkali Creek Ranch, located in Garfield County. <br />Barton Porter Reservoir is located on the ranch, which allowed Mr. Porter to irrigate <br />approximately 900 acres. The reservoir is filled through ditch diversions from South Canyon, <br />Three Mile, and Garfield Creeks, which are tributaries to the Colorado River. Barton Porter <br />Reservoir was constructed in 1958, to a height of 43-feet, impounding 206 acre-feet. <br /> <br />At its September 2002 meeting, CWCB approved a $1,000,000 loan at 2.5% for 20 years to Bill <br />Porter for a $2,000,000 project to expand the capacity of the reservoir to 1,100 acre-feet, <br />requiring the reconstruction of both the east and west dams, with the west dam being at <br />maximum height of 83.5 feet. Reconstruction of the dam allowed him to utilize their full 1,000 <br />acre-feet of conditional storage rights. Bill Porter completed the dam improvements in <br />November 2003, which was inspected and approved by the State Engineer's Office. The <br />reservoir was filled in spring 2004 and has been in operation for the past three irrigation seasons. <br /> <br />'Vatu Supply Pl'otection . 'Yatel'shed Protection & Flood Mitigation' Stream & Lake Pl'otection . 'Yatel' Supply Planning & Finance <br />'Yatet. Conset'vation & Dt'ought Planning' Intt'astate Watu Management & Development <br />