My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150118 Approval letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150118 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2011 8:44:01 AM
Creation date
9/14/2007 3:44:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150118
Contractor Name
Kern Reservoir and Ditch Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 03-110
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CI:5{)/lb <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />DeCember 4, 2002 <br /> <br />Greg E. WiUcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Wayne Miller, President <br />Kern Reservoir and Ditch Co. <br />2319 10th Street <br />Windsor, CO 80550 <br /> <br />Re: Kern Reservoir Rehabilitation <br />Follow-up Loan Recommendation <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Dear Wayne, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />recommended your follow-up loan to the General Assembly for approval. This loan request <br />will be included in the 2003 Water Project Construction Bill. Loan funds will be authorized <br />in spring 2003, once the Govemor has signed the bill. The loan is for rehabilitation of the <br />Kem Reservoir. <br /> <br />The Board approved a loan from the Construction Fund in a maximum amount of $3.62 <br />million at the loan terms of 5.1 % for 30 years or 4.8% for 20 years. I have attached a copy <br />of the updated Board memo concerning the Kern Reservoir and Ditch Company. Please <br />refer to page 4 of that memo and to the section "Action taken by the CWCB November 26, <br />2002." <br /> <br />When the Board approved this follow-up Loan it attached several conditions: <br /> <br />1. A Feasibility Study is required. John Van Sciver has reviewed the draft feasibility study <br />for this project prepared by Rocky Mountain Consultants Inc. John will continue to work <br />with your engineer to ensure that the study meets the requirements of the CWCB <br />Construction Fund Guidelines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.