My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12679
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12679
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:17:23 PM
Creation date
8/7/2007 11:12:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.105.H
Description
Water Projects - Navajo - Operation Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1999
Author
DOI-BOR
Title
Navajo Dam and Reservoir Update - DOI-BOR - 12-01-99
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />OJ~100.) <br />.LOD... <br /> <br />Navajo Dam and Reservoir Update <br /> <br />U.S. Department of the Interior, Bureau of Reclamation <br /> <br />December 1999 <br /> <br /> <br />Navajo Dam and Reservoir <br /> <br />Background <br />The Navajo Unit consists of a dam and reservoir <br />that are owned, operated and maintained by the <br />Bureau of Reclamation. Located on the San Juan <br />River in New Mexico and Colorado, the facility <br />provides an irrigation and municipal and indus- <br />trial water supply, flood control, recreation, <br />hydropower, and fish and wildlife benefits. <br /> <br />Year-round Flow Recommendations <br />In May 1999, after a 7-year research period, the <br />San Juan River Basin Recovery Implementation <br />Program's biology committee recommended <br />flow patterns for the San Juan River. The flows <br />are only one element necessary for the recovery <br />of the endangered Colorado pikeminnow and <br />razorback sucker. It is anticipatedimplementa- <br />tion of these flows, or a reasonable alternative to <br />them, will help protect the existing populations <br />and habitat of these two fish species while <br />maintaining the authorized purposes of the <br />Navajo Unit. <br /> <br />I ' <br /> <br />Draft Environmental Impact <br /> <br />Statement <br />Reclamation will prepare a draft EIS describing <br />the environmental impacts of alternatives for <br />operating the dam and reservoir to implement the <br />Recovery Program's flow recommendations. <br />The draft EIS is scheduled for release for public <br />review in October 2000. <br /> <br />November 1999 Scoping Meetings <br />Scoping meetings were held November 3 and 4 <br />in Farmington, New Mexico, and Durango, <br />Colorado, and on November 9 and lOin Albu- <br />querque, New Mexico, and Pagosa Springs, <br />Colorado, respectively. The meetings were held <br />to obtain the public's concerns regarding imple- <br />menting the flow recommendations. Approxi- <br />mately 100 individuals attended three of the <br />meetings (no one attended the Pagosa Springs <br />meeting). Some of the issues raised at the <br />meetings are included in the following list. <br />
The URL can be used to link to this page
Your browser does not support the video tag.