Laserfiche WebLink
<br />- <br /> <br />.1' <br /> <br />ST ATE OF COLO]~ADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources Q <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303)866-4474 Meeting Announcement <br /> <br />Cherry Creek Dam Safety Study - Technical Meeting #3 Bill Owens <br />Governor <br /> <br />To: <br /> <br />Members and Invited Members of the Technical Review Team <br /> <br />Greg E.Walcher <br />Executive Director <br /> <br />From: <br /> <br />Larry Lang, Project Director, CWCB <br /> <br />Peter H. Evans <br />CWCS Director <br /> <br />Subject: <br /> <br />Agenda for Technical Meeting #3 <br /> <br />Parking: <br /> <br />December 13, 1999 from 1:00 pm to 2:30 p.m. <br />Urban Drainage and Flood Control District, conference room <br />2480 W. 26th Avenue, Suite 156B <br />Diamond Hill Office Complex, phone (303) 455-6277 . <br />Street parking, or use west lot across from UDFCD offi,ee (please place a <br />note in your front windshield indicating that you are at an officiallllleeting at <br />UDFCD, or see the receptionist for a parking tag) <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Logistics: <br /> <br />Date: <br />Location: <br />Address: <br /> <br />Agenda: <br /> <br />1. Welcome and Introductions <br /> <br />2. Review draft meeting minutes from the November 16, 1999 meeting. <br /> <br />3. Report from the Army Corps of Engineers-Omaha District (Corps) regarding the progress of their Cherry <br />Creek Dam Safety Study and response to the Congressional concerns- Bill Miller, Project Manager. <br /> <br />4. Report on the State-Local technical review of PMP and PMF determinations for Cherry Creek Basin- Larry <br />Lang, Project Director. <br /> <br />5. Opportunity for joint technical analysis. <br />. Benefits and risks <br />. Communication strategy <br />. Development of scope of work <br />· Funding _ <br />. Selection and management of contractor(s) <br />. Peer review by technical panel <br />. Corps and National Weather Service acceptance of site-specific analysis. <br />. Need for "Memorandum of Understanding." <br /> <br />.6. Next steps. <br />. Follow-up from November 16, 1999 meeting. <br />. Next meeting schedule, location. <br />. Other. <br /> <br />cc: Peter Evans, Director, CWCB <br />Hal Simpson, State Engineer, DWR <br /> <br />l:\wctrans\seca\projects\cherry crel:k\meeting agenda 12-13-99.doc <br />