My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02170
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:43 AM
Creation date
7/18/2007 9:18:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />.. <br /> <br />t <br /> <br />r. <br /> <br />. <br /> <br /> <br />STATE OF COLORADO <br />STATE BUILDINGS AND REAL ESTATE PROGRAMS <br /> <br />WORK AUTHORIZATION <br />ARCHITECTIENGINEERlCONSUL T ANT SERVICES <br /> <br />Contract # C154045 <br /> <br />Project Title: Diversion Structure Inventory Project - Rio Grande/Upper Colorado Rivers <br />Project Number Work Authorization Routing Number: 06 PDA 00077. <br /> <br />THIS AGREEMENT made this ;2 0 day of April in the year 2006 between the STATE OF <br />COLORADO, acting by and through Colorado Water Conservation Board (Agency/Institution) and Olsson <br />Associates Inc., hereinafter called the Architect/Engineer/ Consultant. <br /> <br />WHEREAS, the Agency/Institution intends to supplement the Base Agreement, dated 7/1/2005 and <br />identified as Base Agreement Routing Number 06 ACA 00327 with professional services as identified <br />below. <br /> <br />WHEREAS, EITHER RECITAL <br /> <br />1. The Agency/Institution has been authorized to expend a total sum of $49,900.00 for <br />professional fees and reimbursable expenses for a scope of work which does not result in <br />construction, OR <br /> <br />2. The Agency/Institution has been authorized to expend a total sum of $ for professional <br />fees, reimbursable expenses, construction/improvements, and project contingencies. T'Jta! <br />construction costs, excluding construction contingency, shall not exceed $ <br /> <br />Additional services may be requested or assigned in writing by the Agency/Institution. The terms, <br />conditions, roles, and responsibilities as defined in the Base Agreement shall govern the work to be <br />performed. The fees for the following services have been negotiated in accordance with Section 24-31- <br />1401 C.R.S. and shall not exceed: <br /> <br />COMPENSATION <br /> <br />Conceptual Design, Report, or Analysis (Recital #1) <br /> <br />$ 49,900,00 <br /> <br />Schematic Design/Design Development Phase (Recital #2) <br />Construction Documents (Recital #2) <br />Bidding Phase (Recital #2) <br />Construction Administration Phase (Recital #2) <br /> <br />$ <br />$ <br />$ <br />$ <br />$ <br /> <br />Reimbursable Expenses (Recital #1 or #2) including <br />_ Bidding Documents Contract Documents <br />Construction Documents Maximum Sets <br /> <br />TOTAL FEES <br /> <br />$ 49,900,00 <br /> <br />This form must be accompanied by Exhibit A Architect/Engineer/Consultant Proposal <br />with Exhibit A-1 Design Services Schedule dated April 2006, consisting of 2 pages and <br />Exhibit A-2 Certificates of Commercial General Liability Insurance and Professional <br />Errors and Omissions Liability Insurance, Exhibit B Wage Rates Schedule submitted <br />with Base Agreement (wage rates page was returned to firm with stamp indicating wage <br />rates were approved for fiscal year and signed by an employee of State Buildings) or the most <br /> <br />Rev. 04/2005 <br />SC-5.1 A-W A <br />
The URL can be used to link to this page
Your browser does not support the video tag.