My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02139
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2011 9:36:53 AM
Creation date
7/17/2007 12:45:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
04000000047
Contractor Name
San Luis Valley Irrigation District
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IMPORTANT <br />The PO # and Line # must <br />appear on all invoices, <br />packing slips, cartons <br />and correspondence <br />ACC: 12-30-03 <br /> <br /> <br />PURCHASE <br />ORDER <br />STATE OF COLORADO <br /> <br />Buyer: <br />Phone Number: <br /> <br />Agency Contact: <br />Phone Number: <br /> <br />WATER CONSERVATION BOARD <br />1313 SHERMAN STREET, ROOM 721 <br />DENVER, CO 80203 <br /> <br />JIM SHARP <br />303-866-2532 <br />STEVEN SHULL <br />303 866 3998 <br /> <br />DATE: 12-31-03 <br /> <br />OE PDA 04000000047 Page# <br /> <br />01 <br /> <br />State Award # <br /> <br />FEIN 846002934 <br />Vendor Contact: <br />Purchase Requisition tt. <br /> <br />Phone: 970-754-2254 <br /> <br />Bid # <br /> <br />SAN LUIS VALLEY IRRIGATION DISTRICT <br /> <br />Invoice in Triplicate <br />To: DIVISION OF WATER CONSERVATION <br />1313 SHERMAN STREET, ROOM 721 <br />DENVER, CO 80203 <br /> <br />v <br />e <br />N <br />o <br />o <br />R <br /> <br />PO BOX 637 <br />CENTER <br /> <br />CO 81125-0637 <br /> <br />Payment will be made by this agency <br /> <br />Ship DIVISION OF WATER CONSERVATION <br />To: 1313 SHERMAN STREET, ROOM 721 <br />DENVER, CO 80203 <br /> <br />INSTRUCTIONS TO VENDOR: <br /> <br />1. If for any reason, delivery ofthls. order is delayed beyond the dellverylinstaUatlon date <br />shown, please noUl'y the agency contact named at the top left (Right of canceUatlon Is <br />reserved In Instances In which lImety delivery Is not made.) <br /> <br />2. All chemicals. equipment an<l materials must conform to tile standards r&qulred b\I OSHA. <br /> <br />3. NOTe: AddRlonal terms and condnlons on reverse side. <br /> <br />Deliveryllnstallation Date: <br />F.O.B. <br /> <br />06-30-04 <br /> <br />SPECIAL INSTRUCTIONS: <br /> <br /> <br />UNE <br />ITEM <br /> <br />COMMODlTYnTEM <br />CODE <br /> <br />UNIT OF <br />MEASUREMENT <br /> <br />QUANTITY <br /> <br />UNIT COST <br /> <br />TOTAL ITEM COST <br /> <br />001 91846000000 <br />FEASIBILITY STUDY TO EVALUATE THE ENLARGEMENT OF THE RIO <br />GRANDE DAM. <br /> <br />$5,000.00 <br /> <br />EPSPO PA~ <br /> <br /> <br />THIS PO IS ISSUED IN ACCORDANCE WITH STATE AND FEDERAL REGULATIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.