Laserfiche WebLink
<br />J ./ <br />, <br /> <br />AGENCY NAME: Water Conservation Board <br /> <br />AGENCY NUMBER: PDA <br /> <br />ROUTING NUMBER: t') 2.. ;: ~A ~^n!5 In <br /> <br />LOAN CONTRACT <br /> <br />THIS CONTRACT, made this 1st day of February 2002, by and between the State of Colorado <br />for the use and benefit of the Department of Natural Resources, Colorado Water Conservation <br />Board, hereinafter referred to as the CWCB and/or STATE, and Peoples Ditch Company, a Colorado <br />nonprofit corporation, 23738 Road 40, Sterling, Colorado, 80751 hereinafter referred to as the <br />BORROWER and/or CONTRACTOR. . <br /> <br />FACTUAL RE.CITALS <br /> <br />1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund <br />Number 486, Organization YYYY, Appropriation 010, GBl P049, Program WTRC, Object Code <br />5881, Reporting Category: 0049, Contract Encumbrance Number C150049. <br /> <br />2. Required approval, clearance, and coordination have been accomplished from and with <br />appropriate agencies. . <br /> <br />3. Pursuant to the provisions of ~~ 37-60-119 and 37-60-120, C.RS. (1999) the STATE is authorized <br />to loan money for the construction of water projects for the benefit of the people of the State, <br />provided that the borrower assures repayment of that money. <br /> <br />4. The BORROWER is a duly constituted Colorado nonprofit mutual ditch company formed pursuant <br />to and governed by Article 42 of Title 7, C.RS., located in logan County, State of C010rado. <br /> <br />5. A Small Project loan Account was established by ~ 37-60-122.7, C.RS. (1999), which authorizes <br />the eWCB to make loans of up to $100,000 without prior approval from the General Assembly if <br />the eWCB determines that delay would result in undue hardship on the borrower. <br /> <br />6. The BORROWER has applied to the STATE for a Small Project loan in the amount of $43,000 to be. <br />used to construct a pipeline to replace the Borrower's washed-out ditch and diversion structure, <br />hereinafter referred to as PROJECT, at a total cost of $75,000. <br /> <br />7. The STATE has reviewed a feasibility report compiled by John Van Sciver, which is incorporated <br />herein by reference, and, based upon this feasibility report, the STATE determined the PROJECT to <br />be technically and financially feasible. <br /> <br />8. At its July 2000 meeting, the CWCB approved a loan to the BORROWER in an amount up to <br />$43,000, at an interest rate of 3.75% per annum for a repayment term of 20 years. The CWCB <br />has determined that this loan qualifies as a Small Project loan in accordance with ~ 37-60-122.7, <br />C.RS. (1999), and the BORROWER will suffer undue hardship if the project is not completed as <br />soon as possible because of the inability to deliver water. <br /> <br />9. The STATE now desires, by this contract, to loan money to the BORROWER for this PROJECT upon <br />mutually agreeable terms and conditions. <br /> <br />THEREFORE, in consideration of the mutual and dependent covenants contained herein, <br />the parties agree as follows: .' ~ <br /> <br />A. The BORROWER agrees as follows: <br /> <br />1. Construction Fund Program Procedures. The following items are procedures the BORROWER <br />shall follow during the construction phase of the PROJECT. <br />