My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10356 (3)
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10356 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:41:22 PM
Creation date
7/16/2007 2:09:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Adams County
Stream Name
First Creek
Title
LOMR - Affected Panel 08001C0045 G - Case No. 02-08-424P
Date
11/25/2002
Prepared For
Adams County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br />OCT 2 ~ 2002 <br /> <br />CERTIFIED MAIL <br />RETURN RECEIPT REQUESTED <br /> <br />IN REPLY REFER TO: <br />Case No.: 02-0S-424P <br /> <br />The Honorable Martin Flaum <br />Chairman, Adams County <br />Board of Commissioners <br />450 South Fourth Avenue <br />Brighton, CO 80601 <br /> <br />Community: Adams County, CO <br />Community No.: 080001 <br />Panel Affected: 0800 I C0045 G <br />Ef~ective.~ate of NOV 25 2002 <br />This ReVISion: <br /> <br />102-I-C <br /> <br />Dear Mr. Flaum: <br /> <br />This responds to a request that the Federal Emergency Management Agency (FEMA) revise the effective <br />Flood Insurance Rate Map (FIRM) for Adams County, Colorado and Incorporated Areas, in accordance <br />with Part 65 of the National Flood Insurance Program (NFIP) regulations. In a letter dated July 8, 2002, <br />P.E., ICON Engineering, Inc., requested that FEMA revise the FIRM to show the <br />effects of channel modifications associated with Belle Creek Filing I along First Creek from just upstream <br />of Brighton Road to approximately 400 feet upstream of U.S. Highway 85 (US85). The channel <br />modifications included realignment of the First Creek channel, channelization along the north side of the <br />relocated channel, construction of drop structures, and grading of limited levee works. On the effective <br />FIRM, the Special Flood Hazard Areas (SFHAs), the areas that would be inundated by the flood having a <br />I-percent chance of being equaled or exceeded in any given year (base flood), along First Creek are <br />designated Zone A, with no Base Flood Elevations (BFEs) determined. This request follows up on a <br />Conditional Letter of Map Revision (CLOMR) issued on February 8, 1999. At the time of the CLOMR <br />request, the project site was located outside the corporate limits of the City of Commerce City in the <br />unincorporated areas of Adams County. With his July 8 request, Mr. Vinson provided documentation that <br />the project site has been annexed by the City of Commerce City. <br /> <br />All data required to complete our review of this request were submitted with letters from -L. <br /> <br />We have completed our review of the submitted data and the flood data shown on the effective FIRM. <br />We have revised the FIRM to modify the floodplain boundary delineations of the base flood along First <br />Creek from Brighton Road to approximately 400 feet upstream ofUS85. As a result of the <br />modifications, the width of the SFHA along First Creek increased in some areas and decreased in other <br />areas. The modifications are shown on the enclosed annotated copy of FIRM Panel 0800IC004~. <br />This Letter of Map Revision (LOMR) hereby revises the above-referenced panel of the effective FIRM <br />dated August 16, 1995. <br /> <br />Because this revision request also affects the City of Commerce City, a separate LOMR for that <br />community was issued on the same date as this LOMR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.