My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150172 Approval letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150172 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:11:40 AM
Creation date
7/11/2007 3:18:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150172
Contractor Name
Union Ditch Company, The
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />March 22, 2004 <br /> <br />Bill Owens <br />Governor <br /> <br />Mr. Gary Alles, President <br />Union Ditch Company <br />P.O. Box 445 <br />Greeley, Colorado 80632 <br /> <br />Russell George <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />RE: Loan to Construct Recharge Facilities <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Dear Mr. Alles: <br /> <br />I am pleased to inform you that on March 17,2004 the Colorado Water Conservation Board (CWCB) <br />approved your loan request. We understand that the loan will be used to construct a groundwater <br />recharge project consisting of three recharge ponds and appurtenances to replace out-of-priority well <br />depletions. <br /> <br />The Board approved a loan in a maximum amount of $312,595 (including the 1 % loan service charge) <br />with loan terms of 2.50% per annum for 30 years. I have attached a copy of the updated Board memo <br />that includes a section "Action taken by the CWCB on March 17,2004." <br /> <br />When the Board approves a loan there remain several conditions: <br /> <br />a) A Feasibility Study is required. Bruce Johnson has reviewed the study titled <br />"Feasibility of the Union Ditch Recharge Project - March 2004." No further action is <br />required of you on this item. The report, in combination with the CWCB board memo <br />dated March 5, 2004 will meet the requirements of the CWCB Construction Fund <br />Guidelines for feasibility studies. <br /> <br />b) An approved contract must be in place before funds can be advanced. J an lllian will <br />place this project on our contracting "hot list" and will initiate the loan contracting <br />process. Once the contract is finalized the Company may request loan funds to cover <br />eligible project expenses. For future reference Jan's phone number is 303-866-3462. <br /> <br />c ) You must adhere to the CWCB Design. and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCB requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will <br />be the basis of the monthly pay estimates for disbursement of your loan funds. Tim's <br />phone number is 303-866-3480. <br /> <br />Flood Protection. Water Supply Plarming and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.