My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150036 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150036 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 3:56:43 PM
Creation date
7/2/2007 1:44:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150036
Contractor Name
Weld County Tri Area Sanitation District
Contract Type
Loan
Water District
2
County
Weld
Bill Number
HB 00-1419
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />WELD COUNTY TRI-AREA SANITATION DISTRICT <br />REGIONAL STORMW ATER DETENTION FACILITY <br /> <br />From Left to Right - Richard Botteieher (Eng), Larry Lang (eweb), Joe Busto (eweb), Tim Feehan (cweb) <br /> <br />Project Description <br /> <br />The communities of Dacono, Frederick, Evanston, and Firestone have consistently <br />experienced flooding problems due to storm runoff from irrigated farmlands and adjacent <br />developments. These communities have suffered many recorded flooding events, dating back to <br />1957, which caused in excess of $300,000 in flood related damages. With significant population <br />growth occurring within the District, the District cooperated in the development of the 1-25 <br />Corridor Master Drainage Plan. The master drainage plan recommended that the existing <br />detention pond located on the south side of Frederick be enlarged to a regional detention pond, to <br />mitigate future flood damage to the surrounding communities. The constructed regional <br />detention pond encompasses over 60 acres of land and stores approximately 146 acre-feet of <br />stormwater during a 100-year event. Additionally, the inlet and outlet channels to the detention <br />facility where reconstructed. The Letter of Map Revision from the Federal Emergency Agency <br />for the project has been approved and will be effective on January 15, 2005. <br /> <br />Proiect Data <br /> <br />Sponsor: Tri-Area Sanitation District <br /> <br />County: Weld <br /> <br />Water Source: Upper Basin Area <br /> <br />Terms of Loan: $2,002,400@5.00% for 30-yrs. Substantial Completion Date: August 1,2004 <br /> <br />Design Engineer: Sears Brown, Inc. (project Management) - Fort Collins, Colorado <br />Tetra Tech, Inc. (Civil Design) - Longmont, Colorado <br /> <br />Construction Contractor: SEMA Construction, Inc. - Denver, Colorado <br /> <br />Regional Detention Pond Storage - 146 acre-feet (100-year) <br />
The URL can be used to link to this page
Your browser does not support the video tag.