My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150009 Project Completion Summary
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150009 Project Completion Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:23:05 AM
Creation date
7/2/2007 1:02:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150009
Contractor Name
Boulder & Left Hand Irrigation Company, The
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SPL
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />. <br />t <br />t <br />t <br />. <br />t <br />t <br />t <br />t <br />t <br />t <br />t <br />~ <br /> <br />ROCKY MOUNTAIN CONSULTANTS. INC. <br /> <br />=I me <br /> <br />Premiere Building <br />825 Delaware Ave.. Suite 500 <br />Longmont. CO 80501 <br />(303) 772-5282 <br />Metro (303) 665-6283 <br />FAX (303) 665-6959 <br />(first initial. last name)@long.rmcco.com <br /> <br />May 14,2001 <br /> <br />Mr. Dennis G. Miller, P.E. <br />Division of Water Resources <br />810 9th Street, 2nd Floor <br />Greeley, Colorado 80631 <br /> <br />Re: Completion of Spillway/Outlet Structure Rehabilitation; Davis No.1 Dam; DAMID 060111; <br />Construction File C-1806 <br /> <br />Dear Dennis: <br /> <br />This letter is to notify you that the construction of the Davis No.1 Dam Outlet Works and Spillway <br />Rehabilitation is completed, as of May 11,2001, in conformance with the approved plans and <br />specifications, and to request approval for full storage. <br /> <br />We understand that final approval will be contingent on the receipt and acceptance of several items in <br />compliance with Rule 10.B of the "Rules and Regulations for Dam Safety and Dam Construction." We are <br />providing the following items: <br /> <br />1) One set of mylar as-built drawings and two sets of blueprint as-built drawings, and <br />2) Two copies of the final construction report. <br /> <br />Conditional approval to store water was obtained on May 5, 2001, and filling of the reservoir began on May <br />8, 2001 at approximately 4.5 cfs (nine acre-feet per day), which allows for the gain of one foot or less of <br />depth per day. The filling of the reservoir is expected to take 15 days, and upon completion, will contain <br />roughly 138 acre-feet of live storage. <br /> <br />We look forward to your approval for full storage and will be glad to answer any questions. <br /> <br />Sincerely, <br /> <br />ROCKY MOUNTc.AIN C%ONSULTANTS, INC. <br /> <br /> <br />!.. i I. <br /> <br />-:t20.d.'f.- ~!t "'-') cfZ <br /> <br />Brandon Collins .. <br />Staff Engineer <br /> <br />cc: John Brunner, wi enclosure <br />Henry Laber, wlo enclosure <br />Boyd Sheets, wlo enclosure <br /> <br />1:\0057 _059.mjb\Conslruction Report\SEO _ Trans.llr.wpd <br /> <br />CIVIL AND ENVIRONMENTAL ENGINEERING . PLANNING <br />
The URL can be used to link to this page
Your browser does not support the video tag.