My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150009 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150009 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:23:05 AM
Creation date
7/2/2007 11:17:48 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150009
Contractor Name
Boulder & Left Hand Irrigation Company, The
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SPL
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BOULDER AND LEFfHAND IRRIGA nON COMPANY <br />DAVIS NO.1 DAM OUTLET WORKS AND SPILLWAY REHABILIT AnON <br /> <br /> <br />Looking east across the dam at the new combined outlet and spillway structure. <br /> <br />Project Description <br /> <br />The Davis No, I Dam is an equalizing reservoir that has an existing capacity of218 acre- <br />feet, located approximately 5 miles northeast of Boulder, The State Engineer's Office during <br />inspection of the facility determined that an outlet pipe had deteriorated beyond repair and that a <br />new spillway be incorporated into the reservoir. Given possible restrictions imposed by the State <br />Engineer's Office, the Boulder and Lefthand Irrigation Company elected to construct a combined <br />outlet/spillway structure. The new control structure consists of a 30" steel outlet pipe and <br />headgate, with a 36" drop inlet/spillway structure. The project was designed by Rocky Mountain <br />Consultants, Longmont, Colorado, The project was constructed by Kemp-Hoffman, out of <br />Northglenn, Colorado at a total project cost of $175,000, <br /> <br />Proiect Data <br /> <br />Sponsor: Boulder & Lefthand Irrigation Co. County: Boulder Water Source: Boulder Creek <br /> <br />Terms of Loan: $100,000 @3,75% for 20-years Substantial Completion Date: Sept. 1,2001 <br /> <br />Design Engineer: Rocky Mountain Consultants, Inc. - Longmont, Colorado <br />'. -~ <br />Construction Contractor: Kemp-Hoffman, Inc, - Northglenn, Colorado <br /> <br />Design Criteria: 74 l.f, - 30" Restrained Ductile Iron Pipe <br />30"x 30" Watermain Series S-3000-F-Y Gate <br /> <br />4'x5'x10' Conc, Outlet Tower <br />42" RCP Inlet Pipe <br /> <br />Annual Volume of Water Delivered by the Project: 2,584 acre-ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.