My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01896
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 3:38:46 PM
Creation date
6/28/2007 2:20:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150199
Contractor Name
Bijou Irrigation District
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />BORROWER: BIJOU IRRIGATION DISTRICT <br />Contract No. C150199 <br />Original Loan Amount $672,660 <br />Adjustment (Increase): $51,290 <br />AdjustHd Loan Amount $723,950 <br /> <br />Agency Name: Water ConseNation Board <br />Agency Number PDA <br />Routing Number: 08 PDA ()olJ J l' <br /> <br />LOAN CONTRACT AMENDMENT No.1 <br />(STANDARD CONTRACT - WAIVER #160 - ApPROVED NOVEMBER 10, 2003) <br /> <br />'This Amendment, made this August 20, 2007, by and between the State of <br />Colorado for the use and benefit of the Department of Natural Resources, Colorado <br />Water ConseNation Board ("CWCB"), and Bijou Irrigation District, P.O. Box 972, Fort <br />Morgan, Colorado 80701, organized under the Irrigation District Law of 1905 (C.R.S. 37- <br />41-101 to -160) ("BORROWER" or "CONTRACTOR"). <br /> <br />FACTUAL RECITALS <br /> <br />A. Autl10rity exists in the law, and funds have been budgeted, appropriated, and <br />othorwise made available for payment in Contract Encumbrance Number C1 ~)0199. <br />B. Required approval, clearance, and coordination have been accomplished 1from and <br />with appropriate agencies. <br />C. Th8' CWCB and the BORROWER entered into Contract Encumbrance Number <br />C1 ei0199, dated September 8, 2006 ("ORIGINAL CONTRACT"), incorporated herein by <br />reference, wherein the CWCS agreed to loan money in the total amount up to <br />$672,660, and the BORROWER agreed to repay the loan in accordance with the terms <br />of the ORIGINAL CONTRACT. <br />D. During construction of the Project, the BORROWER encountered construction, <br />engineering, and legal costs that exceeded the original project cost estimatE~. These <br />items increased the cost of the PROJECT by $56,617. To meet the increas13d costs, <br />the BORROWER requested an additional $51,290 for a total loan amount of $723,950. <br />E. At its May 2007 meeting, the CWCB approved increasing this loan by $51,:290 for a <br />total loan amount of up to $723,950 to finance up to 90% of the total ProjE~ct costs. <br />The terms for the additional loan amount are an interest rate of 2.50% per annum and <br />a repayment period of 30 years. A loan seNice fee of 1 % is included in the additional <br />loan amount In accordance with CWCB Policy No. 16. <br />F. The CWCB and the BORROWER have agreed to amend this contract to increase the <br />amount of the loan by $51,290 including the 1% loan seNice fee for a total loan <br />amount of up to $723,950 which may be used to finance up to 90% of the total Project <br />cost. . <br />NOW THEREFORE, it is hereby agreed that <br />1. Consideration for this Amendment to the ORIGINAL CONTRACT consists of the payments <br />that shall be made pursuant to this Amendment and the ORIGINAL CONTRACT" and the <br />promises and agreements herein set forth. <br />2. It is expressly agreed by the parties that this Amendment is supplemental to the <br />ORIGINAL CONTRACT and all terms, conditions, and provisions thereof, unless <br />speGifically modified herein, are to apply to this Amendment as though they were <br /> <br />Page 1 of 9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.