My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00150 (2)
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00150 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:14:55 PM
Creation date
5/25/2007 2:28:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150116
Contractor Name
B.F. & M.E. Porter, LLLP
Contract Type
Loan
Water District
45
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C/5ollp <br /> <br />STATE OF COLORADO <br /> <br />Colorado V\'ater Conservation Board <br />Department of :\'atural Resources <br />1313 Sherman Stt('("t. Room 721 <br />Derwet, ColoraJo 80203 <br />Phone: (303) S66-34-Il <br />FAX: (303)8b6-I474 <br />................cwcb.state_co.U5 <br /> <br /> <br />September 18, 2002 <br /> <br />BilIOw~ <br />Govemor <br /> <br />Greg E. Walcher <br />EXt'CUl.1ve Olrl'ctor <br /> <br />Rod Kuhanch <br />CWCB Director <br /> <br />Bill Porter <br />857 County Road 314 <br />New Castle, CO 81647 <br /> <br />Re: Barton Porter Reservoir <br />Small Project Loan Approval <br /> <br />Dan ~tcAuliffe <br />Ot>puty DirKtor <br /> <br />Dear Sill. <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (eWeS) approved your <br />Small Project Loan request on September 12. 2002. The loan is for enlargement of the Barton <br />Porter Reservoir. <br /> <br />The Board approved a Small Project Loan from the Construction Fund in a maximum amount of <br />$1 million at the loan terms of 2.5% for 20 years. I have attached a copy of the updated Board <br />memo concerning the Barton Porter Reservoir enlargement. Please refer to pages 3 and 4 of that <br />memo and to the section -Action taken by the CWCS September 12, 2002.- <br /> <br />When the Board approved this Small Project Loan it attached several conditions: <br /> <br />1. A Feasibility StudY is reauired. John Van Sciver has reviewed the feasibility study for this <br />project prepared by Golder Associates Inc. The study meets the requirements of the CWCS <br />Construction Fund Guidelines and has been accepted. Thank you for completing the study in a <br />timely manner. <br /> <br />2. An aooroved contract must be in olace before funds can be advanced. Jan lIIian has placed <br />this project on our contracting "hot lisf and has initiated the loan contracting process. Jan will <br />contact you directly as she drafts the loan contract We expect to have the contract ready for <br />final signature and routing by November so that loan funds will be available by December 1, <br />2002. Jan's phone number is (303) 8S4-2572. <br />
The URL can be used to link to this page
Your browser does not support the video tag.