My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Division 3 Diversion Inventory Rio Grande River - Part 5
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
Division 3 Diversion Inventory Rio Grande River - Part 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:24 AM
Creation date
5/10/2007 3:48:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154045
Contractor Name
Olsson Associates
Contract Type
Grant
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... :~I" 1\. <br /> <br />I~) r\...OLssON <br /> <br />ASSOCIATES <br />143 Union Blvd, Suite 700 Lakewood, CO 80228 720-962-6072 <br /> <br /> <br />RIO, GRAND,E, RIVE'R <br />DIV'E'RSIION STRUCTURE, I,N:VE'NITORY <br /> <br />Structure Name: Rio Grande and Piedra Canal <br /> <br />Reported By: Dave Skuodas <br /> <br />Date: <br /> <br />5/11/06 <br /> <br />Time: <br /> <br />11:15a.m. <br /> <br />Directions: <br /> <br />Head north on U.S. 285 from Monte Vista, turn west on Swede Lane, go <br />approximately 4.9 miles and turn north into the Haywood Ranch and follow the <br />canal to where it meets the river. <br /> <br />Location: <br /> <br />Latitude <br />N37038'06.8" <br /> <br />Longitude <br />W106013'38.9" <br /> <br />Section <br />SE 1/4 S8 <br /> <br />Township <br />T39N <br /> <br />Range <br />R7E <br /> <br />Type: <br /> <br />Mechanically operated 4' wide steel slide gates (4) <br /> <br />Good D No D <br />Condition: Fair [gI Submerged: <br />Poor D Yes [gI <br /> <br />Repair(s) Needed: There is some minor concrete spalling <br /> <br />Reason Submerged: <br />High River Flows <br /> <br />Upstream Configuration: There is a diversion dam downstream that this structure shares with the <br />Monte Vista Canal. There is a short feeder channel that comes off of the river and directs water to <br />this headgate. There is a fence trash rack at the upstream end of the feeder channel. <br /> <br />Comments: There is an adjustment structure downstream located at latitude N37037'13.3", <br />longitude W106013'18.8". This structure is also in good condition, and pictures have been included in <br />the photo log. <br /> <br />Estimated Range of Cost: Low <br /> <br />F:\Projects\20060507\Documents\Reports\Rio Grande\lnventory Forms\Rio Grande & Piedra Canal.doc <br /> <br />OA No. 2-2006-0507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.