My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Metro - Chatfield Reservoir Reallocation EIS_Board Action Letter
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Metro - Chatfield Reservoir Reallocation EIS_Board Action Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:56:47 PM
Creation date
4/26/2007 4:21:19 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Metro
Additional Roundtables
South Platte
Applicant
The Greenway Foundation
Description
Chatfield Reservoir Reallocation Environmental Impact Statement and Feasibility Report
Account Source
Basin
Board Meeting Date
3/13/2007
WSRA - Doc Type
Board Approval Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Congratulations! On March 13 the Colorado Water Conservation Board conditionally <br />approved you grant application for funding from the Water Supply Reserve Account. <br />You will recall that on March 6 you received an e-mail from me outlining stafP s <br />recommendations to fund you water activity. That email contained a Water Activity <br />Summary Sheet which outlined the basis for stafP s recommendations and the CWCB <br />Board approved staff recommendations. <br /> <br />Next Steps <br /> <br />The Water Activity Summary Sheet summarizes the conditions/issues/additional needs <br />which must be addressed. Please revise the applicable sections of your application to <br />address the required information and return it to me. You may do this electronically or <br />by hard copy. Upon receipt of the information it will be reviewed to ensure that it fully <br />addresses the issues and additional needs. <br /> <br />Once all issues and needs are addressed, the scope of work, budget and schedule will be <br />taken from your application and will become part of a contract document between the <br />State of Colorado and the applicant. In simple terms the applicant is agreeing to perform <br />the work contained in the scope of work within the terms of the budget and schedule and <br />will in turn be reimbursed for eligible expenditures. The work products produced are the <br />value that the State is receiving for the use of the funds. <br /> <br />As you can see there are still several important steps and the State contracting procedures <br />take time (I would estimate between 30-60 days once we have all required information <br />and signed documents). If timing is important to you please make sure you submit your <br />information as soon as possible. Also please keep in mind that you must enter into a <br />contract within 6 months of March 13. <br /> <br />Also please note that if you application is for funding under $100,000.00 it may be <br />possible to accomplish the work pursuant to a purchase order which can reduce <br />processing times. <br /> <br />Thank you once again for all your work and I look forward to hearing from you. <br /> <br />Rick Brown <br />Colorado Water Conservation Board <br /> <br />(303) 866-3514 <br />
The URL can be used to link to this page
Your browser does not support the video tag.