Laserfiche WebLink
<br />: <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />IJ J3 Sherman Strect <br />Dcnver, eolorado R0203 <br />Phonc(303)866-3441 <br />FAX (303) 866-4474 <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Executive Dirtxtor, DNR <br /> <br />April 7, 1995 <br /> <br />Danes C Lile, P.E. <br />Director, CWCB <br /> <br />Mr. Perry Eisenach <br />Utility Engineer <br />City of Fort Morgan <br />P.O. Box 100 <br />Fort Morgan, Colorado 80701 <br /> <br />Re: Feasibility Study for CWCB Loan Application <br /> <br />Dear Perry: <br /> <br />Per our telephone conversation last week, I'm enclosing my markups of the three Gronning <br />Engineering reports. My major comment would be that Chapter 6, Project Financing, of the <br />Southern Water Supply Project report should be revised and expanded per the recent <br />information and spreadsheets developed in the last few weeks. Also, as I mentioned last <br />week, it might be good to bind the three reports together for a final submittal. <br /> <br />Please give me a call or ask Gronning Engineering to call me if you have any questions or <br />would like to meet and discuss the enclosed items. <br /> <br />Sincerely, _ J / <br /> <br />.;6 ~/( /-2:~,k~ <br /> <br />William E. Green, P .E. <br />Project Planning and <br />Construction Section <br /> <br />cc: Bill Stanton <br /> <br />w:\wctrans\ftrnrgn <br />