My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11984
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:31 PM
Creation date
10/12/2006 5:20:00 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.175
Description
Wild and Scenic-Dolores River
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
2/25/1975
Author
Bureau Outdoor Rec
Title
Dolores Study-Wild and Scenic-Corresp Reports tech etc 1968-81-Dolores Wild and Scenic River Study MBO Work Plan-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />ATTACHNENT B' <br /> <br />OBJECTIVE 1.0. NUMBER <br /> <br />.EMPLOYEE <br /> <br />nnn:!:lfl T. RnC'k <br /> <br />DATE PREPARED 2/25/75 <br /> <br />-. <br /> <br />WORK CODES <br /> <br />3400 <br /> <br />OBJECTIVE To have llreoared a tlild and "cpnic MEASUREMENTS Preparation of the final r~port <br />lVlI~1 lEnd ~..ull) (Subjo<') <br />river final report and draft cnviroPOlcntal anll'draft EIS. Completion of <br />impact statement on the Dolores River, <br />Colorado. tasks. <br /> <br />COST (M.. 0", & 'A,,"i.1) MCRO - 1.7() M. D <br /> <br />PROGRESS REVIEWS PLANNED ACTUAL <br />MANAGER 1(pn""t" T ('..;:,,~..eT.< DATE APPROVED <br /> <br />OBJECTIVE COMPLETION DATE 1/3/76 <br /> <br />TASKS REQUIRED TO ACCOMPLISH OIlJECTIVE <br /> <br />To' have: <br /> <br />. <br /> <br />All~cated funds and manpower and <br />"determined general approach to study. <br /> <br />~. Established Interagency Study Team and <br />.,--'general organizational structure for <br />study. To have ~ade initial assignments <br />to study team members and determined <br />study procedures, including general <br />M.O;P. objectives. <br /> <br />1. <br /> <br />3. Prepared and signed joint agreement <br />with USFS and Colorado DNR for joint <br />conduct of study. <br /> <br />-4-;'~rjipared and -submitted study MEO to <br />YASO, along with memo explaining study <br />problems, constraints, and alternatives. <br /> <br />5. <br /> <br />Sent letters and memoranda to agencies <br />requesting their participation on Inter- <br />agency Study Team. <br /> <br />6. <br /> <br />Sent letters to public and special <br />interest group organizations and indi- <br />viduals notifying them of public <br />meetings and requesting their ?artici- <br />pat ion in study; sent press releases on <br />public neetings to media; and arranged <br />for public meetings and associated field <br />work in southwest Colorado. <br /> <br />, <br /> <br />INDIVIDUAL TASKS <br />COMPLETION DII TES <br />& COSTS <br />PLANNED ACTUAL <br /> <br />2/14/75 <br />14 M.D. <br /> <br />2/21/75 <br />10 M.D. <br /> <br />2/26/75 <br />2 M.D. <br /> <br />2/26/75 <br />8 M.D. <br /> <br />2/28/7 5 <br />7 M.D. <br /> <br />3/5/75 <br />5 M.D. <br /> <br />PROGRESS REV IEW <br /> <br />Progren andlor probhms. ,.Igted to <br />individual ptrformonct 01 (onditionl. <br />Chronology 01 ruulh ,corrt,li.... adionl, <br />ftcyding, .Ic. <br /> <br />0623 <br />
The URL can be used to link to this page
Your browser does not support the video tag.