My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09376
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:14 PM
Creation date
10/12/2006 3:35:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1989
Title
Economic Evaluation Procedures Phase II Cache La Poudre Project Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />^tl:achment <br />to Revisions <br /> <br />ECONOMIC EVALUATION PROCEDURES <br /> <br />PH^S 1-; I I <br /> <br />CACHE LA POUDRE PROJECT STUDY <br /> <br />Introduction <br /> <br />The economic evaluations to be performed in phase II shall <br />\ <br />be accomplished in accordance with the procedure specified <br />herein. Methodologies and assumptions different from those <br />specified in these procedures may be employed only if approved in <br />advance in writing by the Colorado Water Conservation Board. <br /> <br />Evaluation Criteria <br /> <br />Two evaluation criteria will be employed; <br /> <br />1 , <br /> <br />Net direct economic~it--the 1982 discounted present <br />value of all direc~lbenefits (whomsoever they would <br />accrue) which would result from implementation of a <br />particular alternative, less the discounted present <br />value of all direct costs (~meve-r they ''''0'11 d <br />. <br /> <br />aCQr\;le). 'l'his criterion provides a measure of the <br /> <br /> <br />degree to which the alternatives under study would <br /> <br /> <br />further the economic well-being, Qf toRe flati.:.... <br /> <br />2, Benefit-cost ratio--the ratio of the present value of <br /> <br /> <br />project benefits, less associated costs, to project <br /> <br />costs. This criterion provides a measure of the <br /> <br />222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.