Laserfiche WebLink
<br />FINAL REPORT <br />CLEAR CREEK PROJECT <br />PHASE I, STEP 2 - FEASIBILITY STUDY <br /> <br />Prepared for: <br /> <br />Colorado Water Resources and Power DevelDpment Authority <br />1580 Logan Street, Suite 620 <br />Denver. Colorado 80203 <br /> <br />Prepared by: <br /> <br />Tudor Engineering Company <br />In Association With: <br />Cheryl Signs Engineering <br />Leonard Rice Consulting Water Engineers. Inc. <br />Huller Engineering Company, Inc. <br />Woodward-Clyde Consultants <br />June 1989 <br />