Laserfiche WebLink
<br />OOD~S4 <br /> <br />Figure 5. Modeled monthly flow exceedance curves for the Yampa River at MaybelI under <br />baseline conditions. and projected 2040 demand level conditions with and without the <br />project. <br /> <br />Figure 6. Modeled Elkhead Reservoir end of month storage contents under projected 2040 <br />demand conditions without the project. <br /> <br />Figure 7. Modeled Elkhead Reservoir end of month storage contents under projected 2040 <br />demand conditions with the project. <br /> <br />Figure 8. Comparison of modeled average montWy flows inElkhead Creek beIow Elkhead <br />Reservoir under 2040 demand conditions with and without the project. <br /> <br />,I,;,. <br />