My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08350
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:50 PM
Creation date
10/12/2006 2:55:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC -- Reports
Basin
Arkansas
Water Division
2
Date
6/1/1955
Title
Arkansas-White-Red River Basins - Part II - Section 16 - Minerals and Geology
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />productive or potentially valuable mineral deposits, a <br />mineral policy was formulated to assure appropriate consideration of <br />minerals which would be directly affected by water-development pro- <br />~ects. The policy also provides that proposed reservoir and dam <br />"sites will be examined for the presence of valuable mineral deposits, <br />:and that the data so procured will be conveyed to the interested <br />~agency for its use in planning. This, mineral policy was adopted by <br />~,AWRBIAC and is reproduced in this section. <br /> <br />l7. Cost estimates for mineral resources investigations and <br />research projects are as follows: <br /> <br />(l) The total cost estimate for priority I is $7,265,000 <br />(immediate importance and to be initiated within the first, 3-year <br />period) . <br /> <br />(2) The total cost estimate for priority II project is <br />$7,l25,000 (initiated within second3-year period). <br /> <br />lB. Cost estimates for geologic mapping are as follows:' <br /> <br />(l) Cost estimate for the area to be mapped in first 3- <br />year period is $493,300 a year, total $l,4BO,000. <br /> <br />(2) Cost estimate for the area to be mapped in second 3- <br />year period is $753,300 a year, total $2,260,000. <br /> <br />(3) Cost estimate for the remaining l4-year period is <br />$622,850 a year, total $8,720,000. <br /> <br />5 <br /> <br />o <br />~ <br />N <br />:: <br />... <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.