My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08326
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:46 PM
Creation date
10/12/2006 2:54:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1987
Title
Status of Present Studies Cache La Poudre Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TASK NO: 11 <br /> <br />Aquatic Resource Studies <br /> <br />SUBTASK NO: 11j <br /> <br />Task Report <br /> <br />PURPOSE: <br /> <br />The Task Report will document results of all field and literature <br />subtasks in the Aquatic Resources Studies, as well as expected <br />effects, mitigation and feasibility implications. <br /> <br />APPROACH: <br /> <br />The Task 11 report will provide documentation of agency requests <br />for studies, baseline conditions for fish and macroinvertebrates <br />and effects due to inundation and changes in streamflow. The HQI <br />and RQI results will be presented to serve as bases for stocking <br />recommendations and mitigation planning. The instream flow and <br />temperature analyses will be documented in detail, including <br />sections on site selection, methods and analyses techniques. The <br />feasibility assessment section will focus on project capabilities <br />to meet target flows and stream temperatures for fish and <br />macroinvertebrates. <br /> <br />OUTPUT: <br /> <br />The Draft and Final Task Reports and Executive Summaries will be in <br />a format approved by the Environmental Studies Manager and by the <br />overall Project Managers. An original plus three copies of each <br />report will be provided. Draft reports will be submitted on <br />February 1, 1988. Final Reports will be submitted on April 29, <br />1988. <br /> <br />6l62a <br /> <br />11-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.