Laserfiche WebLink
<br />quantification of project effects in terms of habitat units lost <br />based on the HU value and the number of acres inundated by <br />construction of the proposed project. <br /> <br />OUTPUT: <br /> <br />Interim reports will be prepared for the IFIM and HQI habitat <br />analysis approximately one month following completion of data <br />collection and analysis. Reports will include an evaluation of <br />site selection procedures, data collection and analysis, and <br />quantification of existing habitat. Information will be presented <br />in graphic or tabular form where appropriate, along with appendices <br />containing data collection forms. <br /> <br />A task report on existing habitat will be provided in April 1988, <br />and will incorporate information contained in the interim reports. <br />Other information that will be provided will include: <br /> <br />- Results of the habitat time series in both graphic and tabular <br />form, <br /> <br />- Weighted usable area-discharge relationships, <br /> <br />Suitability index curves for various life stages of species of <br />interest, and <br /> <br />HQI value as trout habitat units per surface acre in <br />potentially affected stream reaches. <br /> <br />6162a <br /> <br />11-13 <br />