Laserfiche WebLink
<br /> <br />TABLE OF CONTENTS -- Continued <br /> <br />Pa~e <br /> <br />TABLES <br />Table 1 - Estimated Project Installation Cost 34 <br />Table 1A - Status of Watershed Works of Improvement 35 <br />Table 2 - Estimated Structural Cost Distribution 36 <br />Table 2A - Cost Allocation and Cost-Sharing Summary 37 <br />Table 3 - Structure Data - Floodwater-Retarding Structures 38 <br />Table 3A - Structure Data - Distribution System Structures 39 <br />Table 4 - Annual Cost 40 <br />Table 5 - Estimated Average Annual Flood Damage <br />Reduction Benefits 41 <br />Table 6 - Comparison of Benefits and Costs for <br />Structural Measures 42 <br />Table 7 - Construction Units 43 <br /> <br />INVESTIGATIONS AND ANALYSES <br />Project Formulation 44 <br />Hydrology and Hydraulics Investigations 44 <br />Engineering Investigations 47 <br />Geologic Investigations 50 <br />Sedimentation Investigations 51 <br />Economic Investigations 51 <br /> <br />Figure 1 - Typical Floodwater-Retarding Structure, Following Page 55 <br />Figure 2 - Typical Inverted Siphon <br />Figure 3 - Water Supply and Demand Curve <br />Figure 4 - Water Supply and Demand by Months (Curve) <br />Project Map - Pine River Watershed <br />