Laserfiche WebLink
<br />).\ <br />" <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />~ ;0;-5. -:~ <br /> <br />fABLE OF CONTENTS- (Cont' 0) <br /> <br />Page <br /> <br />ECONOMIC DATA (Cont'd) <br /> <br />CONSTRUCTION, MANUFACTURING AND GOVERN}lENT 22 <br />GOVERNelENT 22 <br />TRADES AND SERVICES 23 <br />TRANSPORTATION FACILITIES 23 <br />PROJECTED GROWTH 23 <br /> <br />FLOOD AND RELATED PROBLEl-1S <br /> <br />~'.' <br /> <br />EXTENT AND ClIARACTER OF FLOOD AREA <br />NATURE OF FLOOD DA~~GES <br />FLOOD DA.\1AG ES <br />AVERAGE ANNUAL FLOOD DA.'lAGE <br /> <br />25 <br />27 <br />29 <br />30 <br /> <br />FLOOD PROTECTION BENEFITS <br /> <br />GENERAL <br />REDUCTION OF OPERATING COST OF EXISTING FLOOD CONTROL <br />WORKS <br />BENEFITS FRO;1 INCREASED LAND UTILIZATION <br />INTANGIBLE BENEFITS ' <br />NEGATIVE BENEFITS <br /> <br />32 <br />35 <br /> <br />37 <br />37 <br />37 <br /> <br />~ _ _ __ _ ~ __ __ __ __ __ __ __ _ _ _ _ __ _ __ _ _SUMMARY _ _ _ __ _ _ <br /> <br />SU~IMARY <br /> <br />37 <br /> <br />Table <br /> <br />I. ~IONTHLY AND ANNUAL PRECIPITATION NORMALS <br />2. SELECTED STREAM GAGING STATIONS <br />3. PERTINENT DESIGN DATA. PUEBLO DAM AND RESERVOIR <br />4, AREA AND POPULATION OF COUNTIES WITHIN THE STUDY <br />AREA - ARKANSAS RIVER BASIN UPSTREAM FRO\1 JOlIN <br />~1ARTIN DAM <br />5. LABOR FORCE, 1960 <br />6, CROP PRODUCTION IN 1959 <br />7. SU:-1MARY OF ECONomc INDICATOR PROJECTIONS <br />8, FACTORS OF GROII'TII <br /> <br />7 <br />9 <br />13 <br />17 <br /> <br />. <br /> <br />J <br /> <br />18 <br />21 <br />24 <br />25 <br /> <br />ii <br /> <br />j <br />