My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08297
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:40 PM
Creation date
10/12/2006 2:53:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.129.D
Description
Upper Gunnison Project
State
CO
Basin
Gunnison
Water Division
4
Date
8/1/1973
Author
USDOI - BOR
Title
Concluding Report - August 1973 - Upper Gunnison Project - Part 2 of 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-t <br />~ <br />'0 <br />~ <br /> <br />CRAFTER V <br /> <br />ALTERNATIVES STUDIED <br /> <br />Alternative Reservoir Sites <br /> <br />Alternative reservoir sites considered for the Ohio Creek Unit in- <br />cluded the Castleton site on Castle Creek, a tributary of Ohio Creek, and <br />the Hinkle site on Ohio Creek below the confluence of Mill Creek. Both <br />sites were dropped from the plan because of adverse geologic conditions <br />at the potential dam axes. <br /> <br />The Agate site on Tomichi Creek above Sargents was considered as an <br />alternative to Elko Reservoir of the Tomichi Creek Unit. A reservoir at <br />the site would be smaller than Elko Reservoir. It would require a feeder <br />canal from Long Branch Creek and a longer Crookton Canal. <br /> <br />Alternative Canal Alignments <br /> <br />Several different methods of obtaining irrigation water from the <br />Gunnison River were evaluated. One study included building a new canal <br />diverting from the river near the community of Almont and serving lands <br />between the river and Ohio Creek. The high costs of constructing the ca- <br />nal in the rough terrain made the plan infeasible. To avoid the high ca- <br />nal costs an electrical pumping plant was investigated to lift water from <br />the river to a more favorable canal alignment. The high construction <br />costs and high operation, maintenance, and replacement costs proved to be <br />beyond the payment capacity of the irrigators. <br /> <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.