My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08272
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:34 PM
Creation date
10/12/2006 2:51:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443
Description
Narrows Unit
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1982
Author
Appropriations Subco
Title
Narrows Dam Unit of the Pick-Sloan Missouri Basin Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,DGGS <br />Appropriations Subcommittee Members <br />Washington, D.C. <br /> <br />~, <br /> <br />RE: Narrows Dam Unit of the Pick-Sloan <br />Missouri Basin Program <br /> <br />". .;.,. <br /> <br />Construction 6f"this unit was challenged in the United <br />States District Court for Colorado, Civil Action 76-A-608. <br />The suit was dismissed March 2, 1979 on the basis of a Stipu- <br />lation among the parties based on ~hanged conditions, par- <br />ticularly a decision of the Secretary of Interior not tc <br />seek funding for the project. The dismissal was without <br />prejudice. <br /> <br /> <br />On learning that funding is again being sought for <br />the project, Regional Landowners Group, Inc., (RLG) Plaintiff <br />in the said law suit, sent preliminary testimony to this <br />Subcommittee on April 2, 1981. <br /> <br />The Subcommittee's files will reveal an extensive <br />history of this project covering past years. RLG supple- <br />ments its brief ~resentation of April 2, 1981, and its <br />former evidence, in this communication. <br /> <br />Because of Colorado's desire to utilize all the water <br />of the South Platte River allocated to the State by Compact <br />and because there is great need for its efficient and com- <br />plete use, Senators Hart and Armstrong secured appropriation <br />of $200,000 to be used in a study of the water needs and <br />potential alternatives for meeting those needs. The study <br />does not include analysis of "the dam safety aspects of <br />the Narrows Dam as proposed by the U.S. Water and Power <br />Resources Service." (South Platte River Basin Assessment, <br />Plan of Study, March, 1981, page 9.) <br /> <br />The Study will, however, consider plans for water <br />development in the South Platte River Basin proposed by <br />various federal and state agencies to develop the best <br />alternatives, not excluding consideration of Narrows (if <br />it can be made to hold water). The Study is not scheduled <br />to be completed until September 30, 1981 after which the <br />Plan of Study states that "public input will be extremely <br />valuable * * *." It appears to RLG that the Congress should <br />not appropriate money for or further consider the Narrows <br />unit until it has the advantage of the completed study of <br />what is currently. needed in the So~th Platte River yalley. <br /> <br />~ -., ~~,..-- <br /> <br />...---- <br />
The URL can be used to link to this page
Your browser does not support the video tag.