My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08261
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:31 PM
Creation date
10/12/2006 2:51:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8131.600
Description
Southeastern Colorado Water conservancy District - SECWCD
State
CO
Basin
Arkansas
Water Division
2
Date
1/1/1972
Title
Brochure No 5 - The Fryingpan-Arkansas Water Project and It's Structure -- The Future of the Arkansas Valley is It's Water---
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />RUEDI DAM <br /> <br />Collection System and Divide Tunnel <br /> <br />The Proiect collection system is located on the <br />Western Slope of the Continental Divide and collects <br />water. from tributaries of the Roaring Fork River at <br />on altitude of approximately 10,000 feet. <br /> <br />The collection system consists of three main <br />parts, the ~~rth Side System, the South Side System. <br />and the D,vide Tunnel, all integrated to divert an <br />average of 69,200 acre-feet of water per year from <br />the West to the East Slope of the Continental Divide. <br />The South Side System will divert water from the <br />headwaters of Hunter Creek and tributaries of the <br />Fryingpan River through 8.3 miles of conduits and 9.4 <br />mrles of tunnels to the central collection point at the <br />West Portal of the Divide Tunnel. The North Side <br />System diverts water from other tributary headwaters <br />of the Fryingpan River through a system of 4.1 miles <br />of conduit and 7.2 miles of tunnels to the West Portal <br />of the Divide Tunnel. The third main feature of the <br />collecti.on system and backbone of the Proiect is the <br />~.3 mile long Divide Tunnel. The tunnel's function <br />IS to convey the water collected in the North and <br />South Systems to the East Slope of the Continental <br />Divide. The Divide Tunnel will be 10.5 feet in diam. <br />eter a.ffer concrete I.ining, and will have 0 carrying <br />co.paclty of 9~5 cubic feet per second. It is expected <br />thiS Tunnel will be completed in time for delivery of <br />Project water in 1969. <br /> <br />Major East Slope Features <br /> <br />Turquoise Lake and Sugar Loaf Dam <br /> <br />The lake is located five miles west of <br />Colorado. Its present capacity of 17,371 <br /> <br />leadville, <br />acre-feet <br /> <br />9 <br /> <br />.:".:-. <br /> <br />.. ..:~.~:;~:~~~~'~.~'::-:::Z;~..~'-" <br /> <br /> <br />.:: <br /> <br /> <br />" <br /> <br />,;."::; <br /> <br />.... <br /> <br />.. .~.' <br /> <br />.."'.r..,. <br /> <br />,1':' <br /> <br />',"" <br /> <br />.r.: <br /> <br />.: .. <br /> <br />" <br /> <br />o <br />a <br />N <br />o <br />~ <br />N <br /> <br />will be increased to 130,000 covering 1,800 surface <br />acres. This will be accomplished by constructing a <br />135 loot high eorthllll dam below the existing dam, <br />Construction of the dam was started in 1965, and is <br />scheduled for completion in early 1968 to receive'the <br />first Project waters diverted from the .West Slope col. <br />lection system. <br /> <br />Elbert Canal <br /> <br />The Elbert Canol, 14,5 miles in length"will hove <br />a capacity of 500 cubic-feet per second, sufficient to <br />corry diversions from the Arkansas River during the <br />spring and early summer runoff season and to trans. <br />fer Proiect water from Turquoise lake to Twin lakes. <br /> <br />f~[:~f~ <br /> <br />..'.; <br /> <br />i <br /> <br />'" <br /> <br />I <br /> <br />Twin lakes and Twin Lakes Dam <br /> <br />Twin lakes is located 20 miles northwest of <br />Bueno Vista, Colorado. Its capacity will be increased <br />to , 66,000 acre.feet by constructing an earthfill <br />dam 70 feet high. The reservoir will store and regu- <br />late water imported by the Twin lakes Company, <br />flows of lake Creek, and water discharged from the <br />Elbert Powerplant. <br /> <br />Otero Conal <br /> <br />::. ....' <br /> <br />The Otero Conal, 5.7 miles in length with a <br />capacity of 725 cubic feet per second, will deliver <br />water from Twin lakes to Clear Creek Reservoir. <br /> <br />Clear Creek Reservoir <br /> <br />Clear Creek Reservoir with an existing capacity <br />of 11,440 acre-feet is located on Clear Creek 14 miles <br />north of Buena Vista, Colorado and will regulate <br />Project flows to the Arkansas River. <br /> <br />:~'.<i~ <br />;//i'\ <br /> <br />~: ~ <br /> <br /> <br />::, <br />" <br /> <br />'..'I <br />.. <br /> <br />~. <br /> <br />.:'.' <br /> <br />~:,,"-..:: <br />...... <br /> <br />':," <br />.... .. <br /> <br />SUGAR LOAF DAM AND STILLING BASIN <br /> <br />10 <br /> <br />.:-'.---;.~~:..,..:~-:.,. ....:-;:-!;~ ~.: :--:. <br />.. :. .... <br /> <br /> <br />" <br /> <br />". <br /> <br />:.' <br /> <br />", <br />:'~ "'. <br /> <br />:::>~.:;> <br /> <br />" <br />., .,..... <br /> <br />.-r'..,... 'I"' <br /> <br />.::'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.