Laserfiche WebLink
<br />o <br />N <br />Ul <br />W <br /> <br />Table 4-3 <br />Reclamation Basinwide Salinity Control Project Summary <br /> <br />H"'_ ___ ____. ._. H -.-. -.- .- -..-- - .-.. <br /> Proposed <br />Unit/Project Method BOR portion of Total Uniform Cos t <br /> Controls Controls Effectiveness <br /> (tons/vr) (tons/vr) 6.375% 25vrs <br />Hammond Canal Lining 48,130 48,130 $22 <br />UncomMhgre De.~.__ ~pe LateraL_______ 2295 !-___"_.1~ $31 <br />-.---=- !---------- <br />Ashlev Sewage Lagoon 9000 9000 $29 <br /> c-- PRICE-SAN RAFAEL UNIT <br />A "en Lateral Combined Svstem 2031 8,125 $33 <br />North Carbon Combined Svstem 1921 7684 $44 <br />Cottonwood Winter Water 8,506 8,506 $20 <br />n Combined Svstem .-~ ___----1~ _~?>407 $29 -- <br />See1ev -Co Uard Combined Svstem 226 905 $26 <br />Moore Groun Combined System 4,397 17,587 $31 <br />Wellinaton Combined Svstem 17,688 17,688 $22 <br /> UINTA BASIN UNIT <br />Burns Bench Combined Svstem 6675 21 468 $24 <br />I~- Ute Tribe Line & Combined Svstem 50 306 53,344 $30 <br />hesne Countv Pine Canals 20,417 20,417 $36 <br />sworth Pine Canals 9557 9,557 $28 <br />L. Brosh Cr. (Sunshine) Combined System 721 2,763 $33 <br />Western Uintah - ---- ~mbine!!.liystem - - 1~~ 25,780 $18 <br /> - <br /> 2001l!-FP PROJECTS 1250 ------ - <br />Duchesne Irr Co-S Canal Pine Canal 1250 $20 <br />River Canal Pine Canal 4,060 4060 $25 <br />Union Canal Pine Canal 5,255 5,255 $25 <br />Uintah Basin IrrCo Pine Canal 3,578 3,578 $25 <br />Q!L<J.!11ch E ________ ~iR"- C,!na1 and _~.teral 12,973 -- 12,973 $25 -- <br />Drv Gulch C Pine Laterals 15324 1;= $25 <br />Tronic & East Fork Pine Canal 3100 $28 <br />Lawrence South - Pine Canal + USDA Sprinkler -blQi $29 <br />I~rav Park Irr Co Pine Canal 10,131 10,131 $29 <br />Duchesne WCD Pine Canal + nos s ib Ie Snrinkler 42,800 42,800 $30 <br />Ii Total 309,702 404,344 $27 <br /> <br />USDA is implementing on-farm salinity control measures in six project areas in Colorado, <br />Utah, and Wyoming. Approximately one-half ofthe total annual salt control has been implemented. <br />Table 4-4 summarizes the salinity control and costs for the USDA project areas. <br /> <br />4-10 <br />