Laserfiche WebLink
<br />.~ <br />':'":1 <br /> <br />, .J <br /> <br />43 <br /> <br />~ <br />QO <br /> <br />agency may either submit another nominee or appeal the <br />decision to the Coordinating Committee. <br /> <br />Expertise (e.g., aquatic toxicology or other disciplines), if not <br />available among the agency and tribal representatives, will be <br />solicited as needed. The Committee members will select their <br />chairperson; votes will be carried by a two-thirds majority. <br /> <br />The representatives on the Biology Committee will be charged with <br />bringing to the Implementation Program a cooperative and <br />objective analysis of the river's habitats and fish community. <br />Divergent views will be resolved at the Committee level whenever <br />practicable. If resolution cannot be achieved (two thirds <br />majority vote), a report of the question under dispute, including <br />the dissenting views, will be provided to the Coordination <br />Committee for resolution. <br /> <br />The Biology Committee will meet as often as needed; these <br />meetings will be open to the public. A meeting will be scheduled <br />on or about January 31 of each year to review the work <br />accomplished in the previous fiscal year, to address in detail <br />the annual work plan for the current fiscal year, and develop the <br />annual work plan (based upon the Long Range Implementation Plan) <br />for the succeeding fiscal year. A brief report by the principal <br />investigator for each research effort, summarizing <br />accomplishments and problems of research activities for the <br />previous year, and a statement of required research and <br />justification for the upcoming year will be submitted to the <br />Program Coordinator by February 15. The Program Coordinator will <br />compile such reports for transmittal to the involved agencies and <br />Coordination Committee. The Bureau of Reclamation will also hold <br />a meeting with the Biology Committee and the state water <br />regulating agencies during March to determine flow releases from <br />Navajo Dam for the upcoming season. Submittal of the reports, <br />and review and feedback, will be conducted in an expeditious <br />manner in order to avoid delays in implementation of the research <br />effort. The completion of review and provision of comments will <br />be accomplished no later than March 31. <br /> <br />5.1.3 Navajo Dam operating committee <br /> <br />The section 7 consultation on the Animas-La Plata Project <br />required adding an operation requirement to Navajo Dam to time <br />releases from the dam to benefit the endangered fish species. In <br />addition, a number of release patterns will be tested during the <br />research period to aid in determination of the release patterns <br />that are beneficial to the endangered fish species. Close <br />coordination between the Service, Bureau of Reclamation, Bureau <br />of Indian Affairs, Navajo Nation, and the States of New Mexico, <br />colorado, and Utah is required to assure that impacts to users of <br />water stored in Navajo Reservoir and those located downstream of <br />