Laserfiche WebLink
<br />I <br /> <br />". 'J , r, '"l <br />'i~ .J ( -;, ',J -'" <br /> <br />I <br /> <br />I <br /> <br />B.~. EVOL -- Contents of Blue ~esa reservoir at the end of the month <br />(reservoir 2). <br /> <br />I <br /> <br />B.~. EVACS -- The amount of water wh~ch was evacuated from Blue Mesa <br />(above the releases for specific purposes! during the month (link <br />21). ~ . <br /> <br />I <br /> <br />B.M. SPILL -- The amount of water which was apilled from Blue ~esa <br />during the month (link 13). T <br /> <br />I <br /> <br />M.P. INF. -- The incremental virgin inflow above Crystal Dam (inflow <br />3>' <br /> <br />I <br /> <br />B05TW. DMD -- The supply to the demand for the Bostwick Park Project <br />(demand 6 >. <br /> <br />I <br /> <br />B,~. FREE Releases from Blue Mesa wh~cr. are bypasse~ or <br />evacuations and are thus available for appropriation (ll~k 11), <br /> <br />I <br /> <br />T.P. REL'S -- Releases from Taylor Park reservoir tor the G~nnlEo~ <br />Tunnel irrigation U5ers (link 16). <br /> <br />TUNNEL <br /> <br />The flow in the Gunnison Tunnel (link 151. <br /> <br />I <br /> <br />HYDROPOWER -- The flow in the tunnel which has been dlverted undec the <br />weter right for hydropower (11nk 301, Note that total flow~ tor <br />hydropower should incluce releases for M t I in scenario-I. <br /> <br />I <br /> <br />IRRIGATION -- The flow in the tunnel which i8 to be used by irrlgatlor. <br />(link 29>' This includes direct flow divenllons and releases from <br />Taylor Park reservoir. <br /> <br />I <br /> <br />TUN. BYPAS -- The amount of water which is bypassed by the tunnel <br /><link 17). Since the irrigation right at the tunnel is senior to all <br />rights below (in this model) bypasses can only occur whe~ iiiigatio~ <br />de~ands have been satisfied. <br /> <br />I <br /> <br />I <br /> <br />COLD FISH -- Releases under the Blue Mesa Decrees for instream flows <br />in the Black Canyon (link 20). In scenario-5,6 this flow lnc1udes <br />water for boating in June - September. <br />WARM FISH Releases from Blue Mesa for supplementation of flows in <br />critical warm water fish habitat on the Colorado river (link 28). <br /> <br />I <br /> <br />I <br /> <br />M&I REL'S -- Releases from Blue Mesa for M & I uses downstream of the <br />Black Canyon (link 27). <br /> <br />I <br /> <br />LOWER GUN. -- Flow in the Gunnison below the Gunnison Tunnel (link <br />25 ). <br /> <br />I <br /> <br />FISH SHORT -- The total deficit for the month in the 81ack Canyon <br />against the 300 cfs criterla for fishery protection. <br /> <br />BOAT SHORT -- The total deflcit for the month ln the Black Canyon <br />against the 600 cfs criteria for protection of boating, <br /> <br />I <br />