<br />"'.
<br />
<br />> ,
<br />
<br />., Municipal I 1 ~ooa 1 isp. and
<br /> '. Item Total Water Irrigation Po..er COD tro1 Wildlife
<br />km ual b"nefita .~ 9,317,000 ., 1,662,000 $ 4,355,000 $ 2,702,000 $ 598,000 $ -
<br />Leas.sn~ual C.M. & R. costs 1,313,000 412,000 59,000 842,000 0 0
<br />Anr.ual net benefits 8,004,.000 1,250,000 4,296,000 l,tl60,OOO 598,000 -
<br />Justifiable inveat:nent 295,910,000 45,771,000 157,305,000 68,107,000 21,897,000 l/2,330,OOO
<br />Al~ernative expenditure 184,161,000 33,575,000 81,097,000 42,148,000 27,341,000 -
<br />Alt~'"rnative justifiable
<br />e>penciture l;Jl,5['7,000 33,575,000 . ill,097,000 [,2,140,000 21,897 ,000 2,B30,OOO
<br />L"5 s 5?~cif i c costa 60,711,000 21,500,000 0 39,211,000 0 -
<br />Remainder 120,536,000 12,075,000 81,097,000 2,937,000 21,697,000 --
<br />Percent distribution 100,0 10.2 6iJ.7 2.5 18,6 -
<br />Joint coats ill, 187, 000 il,154,OOO 75,128,000 2,734,000 20,341,000 --
<br />Specific cos~s 60,711,000 21,500,000 0 39,2U,ooO 0 2,d30,OOO
<br />Allocation 172,896,000 32,654,000 75,128,000 41,945,000 ' 20,341,000 2,830,000
<br />
<br />January 1953 .Construction CostB
<br />
<br />TABLE 3 .
<br />FR1INGPAll-AP.KANSAS PROJECT
<br />'COOT ALLOCATION
<br />
<br />December 195.3
<br />Accanpa.ni.es reply to
<br />letter of Nov. 10,195.3
<br />from John P. Saylor, M.C.
<br />
<br />.....
<br />
<br />o
<br />o
<br />f-'
<br />-.J
<br />~I
<br /><..0
<br />
<br />1/ Incremental costs of features on i'iestern Slops, aa described in report of the lieg10nal Director for
<br />mit1gat13n of 10868a.
<br />
|