My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08240
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:25 PM
Creation date
10/12/2006 2:50:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8442.600.20
Description
Missouri Basin - Pick Sloan Project - Studies - Enviromental Studies
State
CO
Basin
South Platte
Water Division
1
Date
5/14/1976
Author
DoI, BoR
Title
Narraows Unit, Pick Sloan Missouri Basin Program, Colorado - Final Enviromental Statement
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />Fage <br /> <br />B. Short-Term Gains in Productivity <br />C. Long-Term Resource Commitments . <br />D. Long-Term Gains in Productivity. <br />E. The Extent of Foreclosure of Future Options. <br /> <br />VII- 2 <br />2 <br />',; ;3 <br />4 <br /> <br />CHAPTER VIII <br /> <br />IRREVERSIBLE AND' IRRETRIEVABLE COMMITMENTS OF RESOURCES. <br /> <br />VIII- 1 <br /> <br />CHAPTER IX <br /> <br />ALTERNATIVES . , , <br /> <br />IX- 1 <br /> <br />A, <br /> <br />",.1 <br />1 <br />1 <br />1 <br />2 <br />3 <br />3 <br />3 <br />4 <br />13 <br />15 <br />15 <br />15 <br />15 <br />15 <br />17 <br />18 <br />18 <br />18 <br />19 <br /> <br />'/ <br />, <br /> <br />B, <br /> <br />Alternatives to ~he Proposed Project <br />1. No Development of the Project. . <br />a. Associated Impacts . . . . . <br />2. Further Ground Water Development <br />a. Associated Impacts . . . . <br />3. Weld County Dam and Reservoir. <br />a. Description of the Plan. <br />b. Environmental Impacts. . . <br />c. Summary and Evaluation . . <br />4. Modification of Existing Facilities. <br />a. Associated Impacts ; . . . ~, . . <br />Alternatives Within the Proposal . . . . <br />1. Alternative Transportatidn RelocBtions <br />a. Railroad..... . . . <br />(1) Associated Impacts. <br />b. State Highway and County Roads <br />(1) Associated Impacts. <br />2. Alternative Operating Plans. <br />a. Associated Impacts . . . <br /> <br />CHAPTER X <br /> <br />CONSULTATION AND COORDINATION, . . , , <br /> <br />x- 1 <br /> <br />A. Consultation and Coord'ination During Development of the Proposal and <br />During Preparation of the Draft Environmental Statement. 1 <br />1. Development of the Proposal. . . . . . . . . . . . . . . . . 1 <br />2. Preparation of the Environmental Statement . . . . . . . .. '. 1 <br />B. Coordination During Review of the Draft Environmental Statement. 3 <br />1. Review of the Draft Environmental Statement. 3 <br />2. Public Hearings. . . 3 <br />3. Unresolved Conflicts 4 <br /> <br />BIBLIOGRAPHY <br /> <br />, <br /> <br />11 <br /> <br />GLOSSARY . , <br /> <br />20 <br /> <br />CHAPTER Xl <br /> <br />PART I - LETTERS OF COMMENT. <br /> <br />XI- 1 <br /> <br />" <br /> <br />PART II - PUBLIC HEARINGS, ' <br /> <br />, <br /> <br />330 <br /> <br />xii <br /> <br />.) <br /> <br />" <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.