My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08226
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:22 PM
Creation date
10/12/2006 2:49:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1985
Title
Preliminary Assessment of the Salt Tolerant Emergent Plant (STEP) Process for the Beneficial Use and Disposal of Saline Water -- EXECUTIVE SUMMARY
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />011' .... <br /> <br />.,.,. <br />,.4j <br />C':) <br />() <br /> <br />C~) <br />C' <br /> <br />. <br /> <br />. <br /> <br />D. <br /> <br />Monthly analyses ot STEP process perfor.ance <br />balances and effect of hu.IdIty buIld-up on <br />evapotranspIratIon rates (Tasks 5 and 6) S42.000. <br /> <br />IncludInr heat <br />evaporatIon and <br /> <br />E. Develop a DetaIled Plan tor the STEP PIlot Plant (Task 11) <br />S43,OOO. <br /> <br />The deferred tasks can also be rrouped Into 3 of the above 5 .ajor <br />caterorles as follows: <br /> <br />A. AddItIonal sIte related engineerInr work (Tasks 19. 20. 22, and <br />23) $84,000. <br /> <br />B. Potential i.proveaents In STEP process desIrn (Tasks 12. 13. 14. <br />15, 16. 17.18, and 24) $96.000. <br /> <br />E. Monthly analyses of STEP process perfor.ance (Task 21) S14.000. <br /> <br />E-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.