My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08224
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:22 PM
Creation date
10/12/2006 2:49:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
1/1/1962
Title
News Articles - Press Releases - Miscellaneous Topics
Water Supply Pro - Doc Type
News Article/Press Release
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FACT <br /> <br />.~~SHEET <br />('f": _ " <br />;~ f(~ <br />~/' I) C~ <br />(fY/ ~\ <br /> <br /> <br />CRSP POWER PEAKING CAPACITY - GENERATION AT OUTLET <br />GLEN CANYON OAK, ARIZONA <br />FACT~ SHEET <br />September 21, 1981 <br /> <br />/!If 81:..../,:; g 19r <br />->;-::-. d 1 <br />to! Or-> - <br />COVe;', ,,'/JDO W, <br />~ ct"1~1:'lOM '/JTtf? <br />\ B')4~1) <br /> <br />This fact sheet is being delivered prior to public meetings to help inform the public about the <br />impacts associated with. plan to increase power generation capacity at Glen Canyon Dam by 250 <br />megawatts (HW). The following information along with comments received at the upcoming public <br />meetings will be used to make a decision whether or not to proceed into a feasibility level study <br />for additional power generation capacity at Glen Canyon Dam. Should a decision be made to. continue <br />into a feasibility level study, then more detailed studies will be conducted and a feaaibiliey <br />report and an Environmental Impact Statement will be written. Should a de~ision be made othervise, <br />then the study would be concluded. <br /> <br />Again, as a reminder, the public meetings where the public can comment on the power peaking <br />capacity study for Glen Canyon Dam will be held at the following locations: <br /> <br />DATE and TIMES <br /> <br />September 29, 1981 <br />10:00 a.m. - 12:00 p.m. <br />7:30 p.m. 10:30 p.m. <br /> <br />September 3D, 1981 <br />2:00 p.m. - 4:00 p.m. <br />7:30 p.m. - 10:30 p.m. <br /> <br />October I, 1981 <br />2:00 p.m. - 4:00 p.m. <br />7:30 p.m. - 10:30 p.m. <br /> <br />Octob'H '5, 1981 <br />2:00 p.m. - 4:00 p.m. <br />7:00 p.m. - 9:00 p.m. <br /> <br />LOCATION <br /> <br />Maricopa County Supervisors' Auditorium <br />205 Weat Jefferson <br />Phoenix, Arizona <br /> <br />Flagstaff High School <br />400 West Elm <br />Flagstaff, Arizona <br /> <br />Page High School <br />460 South Navajo Drive <br />Page, Arizona <br /> <br />Denver Puhlic Library (Wyer Auditorium) <br />1357 Broadway <br />Denver, Colorado <br /> <br />The meetings will follow a format as described below: <br /> <br />I. Introduction <br />II. A Short Presentation of Information About the Study by the Durango Projects Office <br />III. Individual Comments/Statements Presented by the PublicI/ <br />IV. Questions and Answers About the Study <br />V. Summary and Conclu'iioll .If the Mt!eclng <br /> <br />}JA comment sheet will be handed out at the beginning of the meeting for those who would like to <br />write down their comment rather than make a verbal comment. These sheets will be collected at the <br />end of the meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.