My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08216
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:20 PM
Creation date
10/12/2006 2:49:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.130.10
Description
Grand Valley Unit - Colorado River Basin Salinity Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/3/1983
Title
Agenda Item 10b Sept. 8-9 1983 Board Meeting -- Inspection and O&M of Private Laterals Grand Valley
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00 <br /> <br />\0'0 <br /> <br />.-J <br /> <br />:~) <br /> <br />c <br /> <br />. <br /> <br />Irrigation systems <br />Government Highline Canal <br />Orchard Mesa Power Cana~/ <br />Grand Valley Power Plant <br />Orchard Mesa Pumping Plant <br />Orchard Mesa Canal No. 1 <br />Orchard Mesa Canal No. 2 <br />Price Ditch <br />Stub Ditch <br />Subtotal <br />Grand Valley Canal <br />Mesa County Ditch <br />Grand Valley Mainline Canal <br />Independent Ranchmen's Ditch <br />Grand Valley Highline Canal <br />Kiefer Extension <br />Subtotal <br />Redlands Power Canal1/ <br />Redlands Power and Pumping Plant <br />Redlands Canal system 80 4,100 <br />Subtotal 2.5 4,500 <br />Small direct diversions 500 <br />Total 194.5 71 ,500 <br />1/ of the 108 laterals, 32 are private, and 76 are Federal <br />2/ The Orchard Mesa Power Canat and laterals have not been included in <br />Stage-Two investigations because the'salt loading from this area is not <br />significant and because most of the lateral system is already lined. <br />3/ The Redlands area has not been included in Stage Two investigations <br />because it is not underlain by the Mancos Formation and because most of the <br />irrigation system is ~lready lined. <br /> <br />. <br /> <br />Grand Valley <br /> <br />. <br />irrigation <br />Initial <br />capacity <br />(cfs) <br />1,675 <br />890 <br />730 <br /> <br />90 <br />70 <br />80 <br />25 <br /> <br />640 <br />30 <br />160 <br />60 <br />340 <br />160 <br /> <br />850 <br /> <br />" <br />,',€~: <br /> <br />systems <br /> <br />Length <br />(miles) <br />54.0 <br />3.5 <br /> <br />16.3 <br />17.3 <br />9.1 <br />10.2 <br />1l0.4 <br />12.5 <br />4.4 <br />14.0 <br />11.8 <br />23.5 <br />15.4 <br />81.6 <br />2.5 <br /> <br />Acres <br />served <br />25,900 <br />560 <br /> <br />4,120 <br />2,710 <br />3,710 <br />900 <br />37,900 <br />4,230 <br />1,090 <br />7,760 <br />2.310 <br />7,240 <br />5,970 <br />28,600 <br />400 <br /> <br />Number <br />of <br />laterals <br />YI08 <br />14 <br /> <br />91 <br />70 <br />109 <br />48 <br />442 <br />52 <br />19 <br />60 <br />35 <br />80 <br />37 <br />283 <br /> <br />725 <br />
The URL can be used to link to this page
Your browser does not support the video tag.