Laserfiche WebLink
<br />to <br />, ,) <br />c"? <br />~ <br /> <br />.:) <br /> <br />~..) <br /> <br />Delivery Systems <br /> <br />, <br />The ,irrigation delivery systems for the Grand Valley consist of both <br />private and Federal developments. The private portion was essentially <br />constructed prior to 1910 and consists of the facilities of the Grand Valley <br />Irrigation Company, the Palisade Irrigation District, Mesa County Irrigation <br />District, the Orchard Mesa Irrigation District, and the Redlands Water and <br />Power Company. The Federal portion of the system is basically the Grand <br />Valley Project, constructed between 1912 and 1917 by the U.S. Reclamation <br />Service (now the Bureau of Reclamation), and which presently carries water to <br />the Palisade, Mesa County and Orchard Mesa Irrigation Districts in addition to <br />its own facilities. Privately owned laterals serve about 75 percent of the <br />valley's irrigated lands. <br /> <br />Private System Concerns <br /> <br />Because the organization on the private system is loose there are many <br />lateral owners not organized into groups legally capable of entering into <br />contracts for the operation and maintenance of improvements under the <br />salinity control program. To alleviate this situation, a Memorandum of <br />Understanding (MOU) was entered into in FY 1982 between the Colorado Coopera- <br />tive Extension Service (CCES) the Soil Conservation Service (SCS) and the <br />Bureau of Reclamation. Under the MOU the CCES is working on programs to <br />organize the private lateral owners into entities capable of entering into the <br />necessary agreement. Such agreements must be completed before construction <br />can begin. . <br /> <br />The laterals under the Federal system are operated by the Grand Valley <br />Water Users Association which is capable of entering contractual agreements, <br />so lateral organization will not be required. <br /> <br />Two agreements for private system water users will be necessary, a permit <br />from landowners that will allow use of land during construction and another <br />that will set forth conditions of operation and maintenance after construc- <br />tion. A major concern regarding the O&M agreement surrounds inspection after <br />construction. This topic has been brought to the attention of the Colorado <br />River Salinity Control Forum to determine if the states would become involved <br />in this aspect of the salinity ,pnogram. The final form for these agreement <br />has not yet been established. ' <br /> <br />Stage Two Construction <br /> <br />Initiation of Construction on Stage Two requires the following: <br /> <br />1. Obtaining an operation and maintenance (O&M) agreement with the water <br />conveyance system owners. This requires organization of lateral <br />system owners into an entity capable of signing and O&M agreement. <br /> <br />2. Completion and filing of an Environmental Statement (ES) with EPA. <br />Filing is scheduled for January 1986. <br /> <br />2 <br />