My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08216
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:20 PM
Creation date
10/12/2006 2:49:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.130.10
Description
Grand Valley Unit - Colorado River Basin Salinity Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/3/1983
Title
Agenda Item 10b Sept. 8-9 1983 Board Meeting -- Inspection and O&M of Private Laterals Grand Valley
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />United States Department of the Interior <br /> <br />BUREAU OF RECLAMA nON <br /> <br />UPPER COLORADO REGION <br />GRAND JUNCTION PROJECTS OFFICE <br />764 HORIZON DRIVE <br />GRAND JUNCTION, COLORADO 81501 <br /> <br />{ <br /> <br />IN REPLY <br />REFER TQ, GJ-450 <br />520. <br /> <br />JUI ,) C\ \,01<':.: <br />-- """ --. ""....;...' <br /> <br /> <br />Mr. Bill McDonald <br />Director, Colorado Water Conservation <br />Building <br />State Department of Natural Resources <br />1313 Sherman <br />832 State Government Building <br />Denver, Colorado 80203 <br /> <br />Dear Bill: <br /> <br />On May 4, 1983, at the Salinity Forum meeting in Moab and again on <br />June 30, 1983, at the Projects Review meeting in Grand Junction, <br />you were approached about the State accepting the responsibility for <br />post project monitoring of the private lateral systems which would <br />be lined or piped under the Federal Salinity Control Program. It is <br />important that we jointly pursue the State's role at this time in <br />order to ensure an expeditious transition into Stage II Construction. <br /> <br />To discuss this topic in depth, we would like to suggest a joint <br />meeting sometime in the near future. We would propose this meeting <br />in your office, or our office if you desire, possibly on August 16, <br />17, or 18. <br /> <br />Please advise us as soon as possible if you think such a meeting <br />would be profitable and the place and time. <br /> <br />I <br />, <br /> <br /> <br />J1SJ <br /> <br />. F. Rinckel <br />Projects Manager <br /> <br />cc: Regional Director, Salt Lake City, Utah <br />Attention: UC-400 and UC-700 <br /> <br />Montrose Construction Engineer, Montrose, Colorado <br /> <br />~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.